Who should read this
Grounds maintenance contractors
Example from the buyer’s notice
Grounds Maintenance Contract 2027 to 2032
This will include grass cutting of village greens and roadside verges, play areas and cemetery; litter and leaf collection; hedge cutting and basic tree and shrub maintenance; weed control; maintenance of benches and noticeboards.
What to check before bidding
- Check how often each site must be visited.
- Identify which equipment, travel and waste costs need pricing.
- Look for seasonal changes in the schedule and any site restrictions.
How to bid for a public sector tender
1. Find the current notice and the right bid stage
Open the buyer’s notice and download the latest documents, including the specification, instructions and pricing schedule. Under the Procurement Act 2023, suppliers can submit a tender in an open procedure. A competitive flexible procedure may ask for a request to participate first. Follow the stage and deadline in the notice. Different procurement regimes can apply, including devolved Scottish procurement.
2. Decide whether the contract fits your business
Check the lots, delivery locations, deadlines and any conditions of participation. Those conditions assess the supplier. The award criteria assess the bid. Record questions for the buyer’s clarification channel and check for updated instructions.
Compare the site list with the maps and service schedules. Check areas, visit frequencies, seasonal work, access restrictions and what the buyer expects you to do with cuttings and waste.
3. Prepare the evidence and price for your bid
Build a checklist for the questions, forms and attachments. Record the buyer’s scoring weights and word limits where provided, and give each item an owner.
If your method is scored, explain how you plan routes, record completed visits and cover absences or equipment failure. Use a comparable contract to show your team has handled similar sites and seasonal workloads.
Model travel and mobilisation separately from work on site. Check whether the pricing schedule requires a fixed rate per site, a rate per visit or separate prices for responsive work.
4. Submit and keep a record
Use the submission route specified in the notice. Allow time to upload the files, check the confirmation and keep a copy of what you submitted. Monitor the buyer’s chosen channel for updates, requests and the outcome.