121 Results (0 seconds)

Status: Awarded
Published Date: 12/12/2023
Closing Date: 23/10/2023
Value: neg.
Crownhill Play Area - AWARD - Crownhill Play Area The play area theme is that of the royal coronation, this fits with both the name of the area and the coronation of king Charles. The play area at present is a mixture of equipment some of which is over 30 years of age, the original fencing is now removed but the tarmac circle remains but will require some restoration as there has been some slumping of the ground. The design intention is to offers a broad range of play types, both physical and cognitive and it to be inclusive in nature.

Status: Awarded
Published Date: 17/11/2023
Closing Date: 01/11/2022
Value: £82,714
Provision of Playground Inspection Reports (including Surfacing) and Outdoor Sports - Direct Award through Lot 15 of the ESPO framework 115_21 Inspection Reports (including Surfacing) and Outdoor Sports Framework Agreement - A Call-Off Contract for the provision of Playground Inspection Reports (including Surfacing) and Outdoor Sports from Lot 15 of the ESPO framework 115_21 Inspection Reports (including Surfacing) and Outdoor Sports Framework Agreement.

Status: Open
Published Date: 01/11/2023
Closing Date: 03/01/2024
Value: £100,000
Elms Park Play Area - To remove and replace the existing play are within Elms Park with modern play equipment suitable for children up to 12 years. This will include new matting , seating and fencing. - Elms Park is an historic park covering approximately 6.736 acres which was originally gifted to the people of Thame in 1948 by Leonard Purser of The Elms, Thame. Elms Park is situated in a conservation area in the south of Thame, adjacent to John Hampden primary school. The park is used by a wide section of the community and includes a multi-use games area (MUGA) and a children's play area. The current play area is approximately 1,389m2 and was installed in the 1970s and has fallen into disrepair. The Council wishes to use this opportunity to renovate the play area and maximise the potential of the site. Scope of work The work will consist of • Detailed designs for the playground, including drawings and specifications • Working in collaboration with the Town Council to undertake a public consultation on the draft designs and to amend them accordingly • Obtaining all necessary permissions, licences and approvals to undertake the work • Removing and disposing of the existing play equipment and fencing • Installing the new play equipment • Installing new surfacing • Installing benches, tables and bins • Installation of new fencing and a gate to the playground area • Associated landscaping to dress the playground • Equipment and workmanship warranties and support for ongoing maintenance The Invitation to Tender document, including more details of the design requirements will be available in attachments along with full details of the tender process and time line.

Status: Open
Published Date: 25/10/2023
Closing Date: 26/10/2023
Value: £100,000
Elms Park Play Area - To remove and replace the existing play are within Elms Park with modern play equipment suitable for children up to 12 years. This will include new matting , seating and fencing. - Elms Park is an historic park covering approximately 6.736 acres which was originally gifted to the people of Thame in 1948 by Leonard Purser of The Elms, Thame. Elms Park is situated in a conservation area in the south of Thame, adjacent to John Hampden primary school. The park is used by a wide section of the community and includes a multi-use games area (MUGA) and a children's play area. The current play area is approximately 1,389m2 and was installed in the 1970s and has fallen into disrepair. The Council wishes to use this opportunity to renovate the play area and maximise the potential of the site. Scope of work The work will consist of • Detailed designs for the playground, including drawings and specifications • Working in collaboration with the Town Council to undertake a public consultation on the draft designs and to amend them accordingly • Obtaining all necessary permissions, licences and approvals to undertake the work • Removing and disposing of the existing play equipment and fencing • Installing the new play equipment • Installing new surfacing • Installing benches, tables and bins • Installation of new fencing and a gate to the playground area • Associated landscaping to dress the playground • Equipment and workmanship warranties and support for ongoing maintenance The Invitation to Tender document, including more details of the design requirements will be available in attachments along with full details of the tender process and time line.

Status: Awarded
Published Date: 13/10/2023
Closing Date: 31/07/2023
Value: neg.
Play Space Refurbishment Sherburn Hill - Awarded to Wicksteed Leisure Ltd.

Status: Open
Published Date: 02/10/2023
Closing Date: 23/10/2023
Value: neg.
Crownhill Play Area - Crownhill Play Area The play area theme is that of the royal coronation, this fits with both the name of the area and the coronation of king Charles. The play area at present is a mixture of equipment some of which is over 30 years of age, the original fencing is now removed but the tarmac circle remains but will require some restoration as there has been some slumping of the ground. The design intention is to offers a broad range of play types, both physical and cognitive and it to be inclusive in nature.

Status: Open
Published Date: 17/05/2023
Closing Date: 22/06/2023
Value: neg.
Play Space Refurbishment Sedgefield Hardwick Park - This is for the refurbishment of the existing Junior play area at Sedgefield Hardwick Park. We are looking to install a new bespoke play unit, complemented by smaller items of play equipment and a sensory area to enable users of all abilities to play together. To submit a tender for this opportunity, the website address is www.nepo.org and insert DN 670546 within the supplier area, the documents are ready to be downloaded and can only be obtained this way

Status: Open
Published Date: 11/05/2023
Closing Date: 29/06/2023
Value: neg.
Grounds Maintenance Framework - Provision of Grounds Maintenance in 6 Lots. Lot 1 - Plants & Shrubs - Lisa Carter Lot 2 - Trees & Conifers - Tim Bryant Lot 3 - Grounds Maintenance Sundries - Ian Wigglesworth Lot 4 - Tree Equipment - Tim Bryant Lot 5 - Bins & Seats - James Goodier Lot 6 - Sports Equipment - Lisa Carter

Status: Open
Published Date: 26/04/2023
Closing Date: 31/05/2023
Value: £85,000
Katy's Corner PP refurbishment - We are excited to offer a design and build opportunity for a new play park within Bude. We're looking for a team that can provide a complete solution and that can offer the following services: Design and Consultation • Help consult with local users and stakeholders to explore design requirements, learning possibilities, desired story-telling direction and capture the culture of Bude • Produce a design to fulfil the requirements of the project brief as determined by the consultation • Work with the Town Council and their Facilities Manager to ensure that the design, materials and workmanship ensure long life and reparability • To help write up documents required for planning permission - if required • To provide technical assistance in the production of grant applications as necessary (with final submission being done by BSTC) • To assist in BSTC vision of being carbon neutral by 2030 with sustainable materials, delivery and construction and be able to provide carbon audits if required Reconfigure and Install Provide project management, Remove previous equipment and make safe the flooring of the upper area Manage safe site access and security Groundworks and installation of flooring in the lower area Construction and installation of equipment Safety sign-off Provision of warranties and aftercare repairs service We are interested in a range of solutions - from off the shelf equipment to completely unique designs. The direction taken will be directed by the local community and budget/grant funding available. The design/s produced will go onto a final vote to the Town Council and if approved we will then commit to a chosen design & budget, and commission the project and install

Status: Closed
Published Date: 20/03/2023
Closing Date: 04/05/2023
Value: neg.
New Bradwell Local Park - Play Area Construction Works - New play area for New Bradwell