528 Results (0 seconds)

Status: Awarded
Published Date: 05/10/2023
Closing Date: 07/02/2023
Value: £38,618
Coronation Road Garage Site, Stainforth - Lot 2 - • The site is an old garage site used for residential parking and access will have to be limited during the duration of the works. • There is an access path to a playing field and children's play area from the garage site and precautions must be taken to ensure safety.

Status: Awarded
Published Date: 05/10/2023
Closing Date: 23/01/2023
Value: £35,157
Carriageway Patching 2022-2023 Batch 13 - Carriageway patching and associated works at 5no sites in Doncaster

Status: Awarded
Published Date: 05/10/2023
Closing Date: 06/09/2023
Value: £32,482
Church Lane, Warmsworth - Resurfacing - Church Lane, Warmsworth - Resurfacing

Status: Awarded
Published Date: 03/10/2023
Closing Date: 15/09/2023
Value: neg.
Resurfacing of Playground, Car Park and Associated Works at Wood End Infant & Pre School - AWARD - Resurfacing of Playground, Car Park and Associated Works at Wood End Infant & Pre School

Status: Open
Published Date: 29/09/2023
Closing Date: 23/10/2023
Value: neg.
Gainsborough Sports Centre: Main Hall Floor - Sand, Seal and Remark - Ipswich Borough Council are currently out to tender for the provision of Gainsborough Sports Centre: Main Hall Floor - Sand, Seal and Remark This opportunity is available in the `Current Tenders` area of portal. Interested parties are invited to express their interest to gain full access to the tender documentation. The deadline date for submissions of the tender is Monday the 23rd of October 2023 at 11am. Please note late returns will NOT be permitted The deadline for clarification questions is Monday the 16th of October 2023 at 11am, which must be generated via the correspondence option on the website

Status: Open
Published Date: 26/09/2023
Closing Date: 24/10/2023
Value: £200,000
Resurfacing and Ancillary Works to Edginswell Railway Bridge, Torquay - Edginswell Railway Bridge supports the A380 dual carriageway locally southwest bound on Hamelin Way, Torquay. This route is a primary thoroughfare for traffic into and out of Torbay. The bridge is maintained by Torbay Council. Surfacing and joints display defective condition requiring remediation. This contract accordingly requires resurfacing works and replacement of both joints. The woks will require associated temporary removal and reinstatement of traffic signal circuitry. Due to its strategic importance the bridge is required to be maintained open as far as possible, works then being restricted to be contained within lane closures. Full closure of the bridge may be arranged by agreement for purposes of installation of the wearing course only. Network Rail will be engaged to observe works' progress due to the proximity of the main rail line.

Status: Open
Published Date: 26/09/2023
Closing Date: 30/10/2023
Value: £200,000
Resurfacing and Ancillary Works to Edginswell Railway Bridge, Torquay - Edginswell Railway Bridge supports the A380 dual carriageway locally southwest bound on Hamelin Way, Torquay. This route is a primary thoroughfare for traffic into and out of Torbay. The bridge is maintained by Torbay Council. Surfacing and joints display defective condition requiring remediation. This contract accordingly requires resurfacing works and replacement of both joints. The woks will require associated temporary removal and reinstatement of traffic signal circuitry. Due to its strategic importance the bridge is required to be maintained open as far as possible, works then being restricted to be contained within lane closures. Full closure of the bridge may be arranged by agreement for purposes of installation of the wearing course only. Network Rail will be engaged to observe works' progress due to the proximity of the main rail line.

Status: Open
Published Date: 11/09/2023
Closing Date: 09/10/2023
Value: £80,000
Martinfield - Path resurfacing and associated external works - Progress Housing Group are seeking an experienced Contractor to complete an External Works Improvement Scheme at Martinfield, Penwortham, Preston PR1 9HJ as per specification in attached Tender Document. The appointed contractor is to undertake the role and duties of Principal Contractor on the site, properties within it will be fully occupied and in use throughout the contract. The Contractor will need to be fully compliant with all Health and Safety regulations and in accordance with the CDM 2015 Regulations. Site Visit Contractors must visit the site and ascertain for themselves the exact nature of the proposed works. Access can be arranged by attending site and contacting the Scheme Manager via the pull cord system.

Status: Awarded
Published Date: 06/09/2023
Closing Date: 18/08/2023
Value: £152,844
Planing, Re-surfacing and re-lining of Council car parks - Planing, Re-surfacing and re-lining of Council car parks

Status: Withdrawn
Published Date: 29/08/2023
Closing Date: 21/09/2023
Value: £100,000
ED0257-23 - 1016 - Beer Cliff Top Car Park - The works comprise of the resurfacing of Beer Cliff Top Car Park, Beer, with a HBM material subbase to be 200mm thick minimum then 40mm stone mastic asphalt and is to include; installation of a soakaway and new drainage system, weed-killing/vegetation removal (if required);