This specification describes the proposed refurbishment of the main central boiler room at the Grimsby Institute. The refurbishment works shall include the replacement of the existing pipework, pumps and controls within the boiler room, plus associated electrical works (power supplies, control wiring and containment). This scope of works shall also include the replacement of the existing feed and expansion tanks for the heating system, plus associated feed and vent pipework. The site installation works will be programmed over a period of 4 months, making use of the holiday periods for carrying out the most disruptive works. This specification is to be read in association with the mechanical services drawings and schematic layout. The Mechanical Services Contractor (MSC) is to include for all labour, supervision, and materials in order to carry out the complete installation as indicated on these drawings or included with this specification. Due to location of mains cables some of which are bitumen and paper wrapped and 1959 era mains swich gear a specification has been included for the Main plant room Electrical Switchgear and sub main replacement. This document will be part of the main project due to time scales and access.


Industry Sector


Contact Details - Login to view

CONTACT INFORMATION FOR THE CONTRACTOR
NAME, TELEPHONE NUMBER, EMAIL ADDRESS,
POSTAL ADDRESS AND WEB ADDRESS


More Information

Contact Details - Login to view

information fed from tender feed information fed from tender feed information fed from tender feed