412 Results (0.1 seconds)

Status: Open
Published Date: 17/05/2024
Closing Date: 14/06/2024
Value: neg.
CBC-1683-T-TS Communal Boiler Replacement - Housing Services - Communal Boiler Replacement - Housing Services Please READ/follow the information and guidance supplied below and within the Tender documents, this will help with your tender submission. ➢ Word count limits apply, any information going over will not be considered. ➢ Respond to ALL questions. ➢ Additional documents or information not required will be disregarded. ➢ Please note timeline with regards to questions and submission dates. ➢ All communication/correspondence and clarifications must be sent via the In-tend portal. ➢ Do not contact the Service area for information, please use the correspondence facility ➢ Regularly view the 'Clarification' tab for updates or responses to questions received by bidders. ➢ Questions asked together with the response, will be made available to all bidders (if not P&C), this to ensure a fair and consistent approach to all. ➢ Avoid uploading your return just prior to closing deadline as you may incur IT issues and we will not accept Tender Returns via e-mail. The Council will provide as much support and information as it can to help guide you through the Tender process. If there is anything you are not sure of or need clarification on, please contact the Procurement lead using the correspondence facility within the In-tend electronic tendering system. Opting In ➢ To inform us of your decision to participate and to be able to submit a tender you will be required to Opt In. Opting In will confirm to us of your involvement and your intention to submit a tender return. Opting Out ➢ Will confirm that you are no longer interested in submitting a tender return. You will be able to provide a reason as to your decision if you wish. This will cease any system-generated communications. You will be able to opt back in at any point. Target contract commencement date: 01 August 2024 Contract term: 1 month

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Open
Published Date: 05/04/2024
Closing Date: 01/05/2024
Value: £70,000
Padgate Library Boiler Installation - Transform the library's heating and hot water system into a standalone system. This entails installing a new boiler plant and cylinder within the library building and integrating it into the existing library heating circuit.

Status: Open
Published Date: 05/04/2024
Closing Date: 01/05/2024
Value: £70,000
Padgate Library Boiler Installation - Transform the library's heating and hot water system into a standalone system. This entails installing a new boiler plant and cylinder within the library building and integrating it into the existing library heating circuit.

Status: Awarded
Published Date: 04/04/2024
Closing Date: 29/09/2023
Value: £200,000
Walter Preston Court - Plant Room Refurbishment - Walter Preston Court Plant Room - Works Required\r The replacing and upgrading of the system at Walter Preston Court to make it more energy efficient, this will cover all aspects including, heat generation, controls and heat distribution.\r \r Walter Preston Court is part of the Council's sheltered housing scheme, it has 34 units made up of 1 and 2 bed apartments. The scheme is understood to have been built in 1990 and the heating boilers are original.\r \r The objective is to improve the energy performance and condition of the heating and hot water services. \r

Status: Awarded
Published Date: 27/03/2024
Closing Date: 31/01/2024
Value: £107,962
Plant Hill Health Centre Boilers & Water Heater - Plant Hill Health Centre Boilers & Water Heater

Status: Open
Published Date: 22/03/2024
Closing Date: 22/04/2024
Value: neg.
TEC Partnership - Boiler Room Refurbishment - This specification describes the proposed refurbishment of the main central boiler room at the Grimsby Institute. The refurbishment works shall include the replacement of the existing pipework, pumps and controls within the boiler room, plus associated electrical works (power supplies, control wiring and containment). This scope of works shall also include the replacement of the existing feed and expansion tanks for the heating system, plus associated feed and vent pipework. The site installation works will be programmed over a period of 4 months, making use of the holiday periods for carrying out the most disruptive works. This specification is to be read in association with the mechanical services drawings and schematic layout. The Mechanical Services Contractor (MSC) is to include for all labour, supervision, and materials in order to carry out the complete installation as indicated on these drawings or included with this specification. Due to location of mains cables some of which are bitumen and paper wrapped and 1959 era mains swich gear a specification has been included for the Main plant room Electrical Switchgear and sub main replacement. This document will be part of the main project due to time scales and access.

Status: Awarded
Published Date: 04/03/2024
Closing Date: 19/01/2024
Value: £70,000
HPFT - Boiler Replacement Works at Kingfisher Court - No. 3 Boiler Replacement at Kingfisher Court for Hertfordshire Partnership University NHS Foundation Trust.

Status: Awarded
Published Date: 01/03/2024
Closing Date: 09/02/2024
Value: £125,496
Dartford West Health Centre - Boiler Upgrade Scheme - Dartford West Health Centre - Boiler Upgrade Scheme

Status: Open
Published Date: 01/03/2024
Closing Date: Unknown
Value: £9,850,000
Heating Upgrade Framework - Installation of boilers, replacement of full heating systems and removal of secondary heating appliances