445 Results (0 seconds)

Status: Closed
Published Date: 22/04/2015
Closing Date: 15/05/2015
Value: £100,000
GB-Edgware, Middlesex: Deborah Lodge Boiler & Associated Plant Replacement, Edgware, Middlesex - The works are to include: Replacement of the 3no existing gas-fired boilers, with new gas fired condensing boilers, new tank in tank high recovery stainless steel cylinders, replacement including pumps, control valves, flues and associated works. Separate prices required to connect annexe heating to new boiler plant including removal of existing Vaillant boiler and installation of a heat meter on the heating circuit to the dwellings and the secondary hot water to the dwellings and associated works.

Status: Closed
Published Date: 13/04/2015
Closing Date: 01/05/2015
Value: neg.
Kedleston Rd, Boiler Replacement and CHP - The Services Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and within this specification, employing skilled personnel and specialist contractors as necessary to achieve the standards described. The works include the supply, installation, testing and commissioning of new replacement boilers, builders work, CHP, chiller, BMS controls, back up HWS generation, new replacement pumps, new pipework and associated mechanical and electrical services within the East Tower and North Tower plantrooms at the University of Derby, Kedleston Road Campus in Derby. The works shall also include the isolation, de-commissioning, strip-out and removal from site of the existing boiler plant, chiller, pumps, pipework control wiring and associated installations made redundant by the replacement boiler/chp/chiller installation. The Mechanical Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and within this Specification, employing skilled personnel and specialist contractors as necessary to achieve the standards described. The works are to be carried out two phases, Phase 1 to provide direct gas fired HWS generation to cover the summer period and when commissioned and operational to remove the existing boiler plant, controls, pipework pumps and Install new boiler plant pipework, pumps, controls, pipework and chillers before 1st September 2015. Phase 2 to de commission the R22 chiller and remove, install the new CHP, complete the chilled water system and commission and then complete and commission the CHP by the 2nd November 2015. Contract is to be MF/1 All of works are to be carried out to the agreed programme and completed by 02/11/15. The project shall be phased to ensure minimum disruption is caused on site. The contract intended programme requirements are appended to this section of the Specification. Date for Commencement of the works (to allow plant lead-in periods): 11/05/15 Date for start on site: 11/05/15 Date for Completion Phase 1: 31/08/15 Date for start of Phase 2: 14/09/15 Date for Completion Phase 2: 02/11/15 The Services Contractor will be required to prepare a master programme and progress chart to clearly indicate how the work is to be carried out to completion within the period of the Contract. To arrange a site visit please contact Ian Cain on 01332 591104 or i.cain@derby.ac.uk or Martin Simms on 01332 591107 or m.simms@derby.ac.uk

Status: Closed
Published Date: 09/04/2015
Closing Date: 12/05/2015
Value: £50,000
Spinal Unit Boiler Replacement - The Duke of Cornwall Spinal Treatment Centre at SDH covers most of southern England with a population of approximately 11 million people. As part of ongoing modernisation works, the existing boiler and associated pipework requires replacement Extent of Works 1. Isolate and disconnect existing boiler, strip down electrically and mechanically, and remove from site. Retain burner for reuse. 2. Supply and install a new Viessmann Vitorond 200 380kw boiler complete with Weishaupt WGL40/1-A dual fuel burner. 3. Reconnect boiler to existing isolation points and flue, connect / adapt as required, fill and test. 4. Allow for specialist engineer to commission the burner and provide data to the supervising officer. The Procurement process is being conducted via the Trust’s Ariba procurement portal. Interested bidders should email tenders@salisbury.nhs.uk with the subject title “FE728 Spinal Unit Boiler Replacement” including full named contact details, with telephone, email and address, for the person responsible for preparing their response. The Trust will then register the bidder on the Ariba portal, and the bidder will automatically receive an Ariba event invite key. Please ensure email systems are set to whitelist from the ariba.com domain.

Status: Closed
Published Date: 08/04/2015
Closing Date: 11/05/2015
Value: £25,000
Energy Centre Burner Replacements - Salisbury District Hospital - The main energy centre at Salisbury District Foundation NHS Trust has boiler capacity which is circa 25 years old. There are three main 2.4mw boilers of that age, one 1mw boiler ten years old and a 850kw thermal CHP which acts as the primary boiler. This project will be to replace the 3x obsolete Nu-Way model BNR dual fuel burners with new burners from a compatible manufacturer. Works shall include the installation of the replacement burner and panels, commissioning as well as any energy saving initiatives to further update the boiler system. The Procurement process is being conducted via the Trust’s Ariba procurement portal. Interested bidders should email tenders@salisbury.nhs.uk with the subject title “FE726 Energy Centre Burner Replacement” including full named contact details, with telephone, email and address, for the person responsible for preparing their response. The Trust will then register the bidder on the Ariba portal, and the bidder will automatically receive an Ariba event invite key. Please ensure email systems are set to whitelist from the ariba.com domain.

Status: Open
Published Date: Unknown
Closing Date: Unknown
Value: £4,000,000
Replacement Boiler Plant and Distribution Works - KSIS - BFLPT - Invitation to Tender for the replacement of boiler plant, distribution, hot and cold water distribution and rectification works including lighting and decoration.