31 Results (0 seconds)

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Awarded
Published Date: 21/03/2024
Closing Date: 25/02/2024
Value: £81,769
BE24054 - Test Blocks - ***Please note that this is an award notice and not a call for competition*** UK Research and Innovation had a requirement for the supply and delivery of concrete test blocks. This was awarded following a competitive quotation process.

Status: Awarded
Published Date: 15/12/2023
Closing Date: 10/12/2023
Value: £18,226
RC Pad - 12 x 7 RC Pad

Status: Awarded
Published Date: 26/05/2023
Closing Date: 31/03/2022
Value: £59,158
COV - VLR Slab Track TP2 - Provision of track slabs for VLR installation at VLRNIC.

Status: Awarded
Published Date: 05/05/2023
Closing Date: 25/04/2023
Value: £10,559
Concrete Pad and Path for Modular Building - Concrete pad and paths for modular building

Status: Closed
Published Date: 22/12/2022
Closing Date: 24/01/2023
Value: neg.
Ground improvement and stabilisation of a Maritime Quay in St Helier, Jersey, Channel Islands - Ports of Jersey require ground improvement, stabilisation and jacking of the hardstanding slabs c2000m2 for New North Quay, St Helier. New North Quay is located in St Helier, Jersey and is a man-made in filled granite structure with a concrete. These works are located on an operational quay, with the only LOLO operations for the Island of Jersey so it is imperative that the disruption to operations is kept to a minimum. Ports of Jersey are looking to procure a design and install solution that will need to last a minimum of 7 years. The existing underlying infill material is weak, and 'fines' have been washed out due to rising and falling tides. St Helier has a tidal range of approximately 12m.

Status: Awarded
Published Date: 07/10/2022
Closing Date: 15/07/2022
Value: £12,300
Swanee Pond Banking Reinstatement - Swanee Pond, Yews Lane, Kendray, S70 3LJ. See documentation for further details.

Status: Closed
Published Date: 29/09/2022
Closing Date: 09/12/2022
Value: £40,000
External Staircase - 134 Spital Lane, Chesterfield - Design, supply and build steel staircase and handrail including foundations.

Status: Closed
Published Date: 21/12/2021
Closing Date: 28/01/2022
Value: £500,000
GB-Kings Lynn: FS04 - West Walton Fire Station Drill Yard Reconstruction - Construction of reinforced concrete drill yard and permeable car park area. Including drainage, fencing and vegetation works.

Status: Awarded
Published Date: 12/08/2021
Closing Date: 11/03/2021
Value: £50,000
Concrete slab installation - Contractor required for the supply and installation of concrete slabs to support fluid tanks. Full design details and drawings will be provided to shortlisted suppliers. Contractor must be able to demonstrate evidence of compliances. Suppliers will be assessed on various factors including, but not limited to, Quality, Safety, Experience, Adding Value. Small Medium Enterprises are actively encouraged within this Project and the promotion of innovation and sustainable working practices. Bauer Keller is a Joint Venture formed from two of the World's Largest Specialist Geotechnical Contractors. The Joint Venture allows both companies to work together, providing a wealth of knowledge and experience, using proven, best practice techniques. We are committed to providing a safe and healthy working environment and we strive to deliver the highest standards, collaborating across disciplines to bring our customers consistently high performance in order to meet their needs.