128 Results (0 seconds)

Status: Awarded
Published Date: 26/11/2021
Closing Date: 19/11/2021
Value: £121,852
Scour Risk Ground Investigations - Call off from DN296947 Ground Investigation Contract 2018-2022 to carry out scour risk ground investigation works at numerous bridges for Leeds City Council.

Status: Awarded
Published Date: 26/11/2021
Closing Date: 22/09/2021
Value: £192,614
MetroWest Phase 1 - Ground Investigations - North Somerset Council procured a supplier to undertake Ground Investigations of land and 5 bridges adjacent to the proposed Portishead Branch Line (MetroWest Phase 1 project).

Status: Closed
Published Date: 25/11/2021
Closing Date: 10/12/2021
Value: £110,000
Stroud Canal Missing Mile - Ground Investigation - Gloucestershire County Council (GCC) are seeking a supplier to undertake a ground investigation near Junction 13 of the M5 to characterise the ground and groundwater conditions along the proposed canal alignment for: • The construction of the canal and its associated structures • Reuse of the material excavated from the canal for construction of embankments. The ground investigation will comprise a series of trial pits and boreholes in four locations: along the alignment of the proposed canal, and at three existing bridges. The majority of these will be undertaken along the proposed canal, comprising 50 trial pits and 10 boreholes. The following three locations are where bridges are proposed, with two locations being comprised of one borehole each, and the final having two 3 trial pits, 1 borehole and 6 dynamic probes. Geotechnical and environmental sampling, in-situ and laboratory testing and the production of a factual report will be required. It is anticipated that two rigs will be required to complete the work in the proposed timescale of approximately 3 weeks with two engineers. The contractor shall provide a proposed programme of works and an indication of possible site work start date as part of their tender submission. The ground investigation contractor will be required to assume the role of Principal Contractor and associated responsibilities in accordance with the CDM 2015 regulations and to arrange traffic / pedestrian management (if required). The terms and conditions are the NEC4 Engineering and Construction Short Contract 2017 as amended in the terms and conditions provided as part of the tender documents. Full details are available here: https://procontract.due-north.com/Advert?advertId=becaed1d-424e-ec11-810e-005056b64545

Status: Closed
Published Date: 12/11/2021
Closing Date: 03/12/2021
Value: £20,000
Ground Investigations and Topographic Surveys for NYMNPA Blue Corridors Project - The North York Moors National Park Authority Blue Corridors Project aims to address ten in-channel obstacles to fish passage in the Rye and Esk catchments. Pick Everard, supporting Envirocentre Ltd, have produced designs for these ten obstacles. One of the sites, Esk 11 Main Esk Weir (Castleton), is on hold and is not included in this contract. This contract is to provide further detailed information regarding nine of the sites to inform the designs. This will be provided through topographical surveys and ground investigations of each of the sites.

Status: Closed
Published Date: 11/11/2021
Closing Date: 10/12/2021
Value: £70,000
Radnor Street Retaining and Parapet Wall Works - Radnor Street Retaining and Parapet Wall Works Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of strengthening and maintenance works to a retaining and parapet wall in Swindon. Project Description Works and materials are required to strengthen and maintain a retaining and parapet wall to the rear of No.40 Radnor Street, Swindon. The initial contract term will be for 9 weeks, as stated in the RFQ documents. Full details relating to the Works are provided in the tender documents. To participate, Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the tender documents. In the event of difficulties registering as a supplier, please refer to the System Administrator Proactis support team ProContractSuppliers@proactis.com Tender clarifications to be submitted in writing via Messaging in ProContract tender portal by 6th December 2021, 1200 hrs UK Local time. The Council's responses to these clarification questions will be issued on the ProContract tender portal. Tender Responses are required to be submitted no later than 10th December 2021, 1200 hrs UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/ Please note that this project has been advertised on Contracts Finder, however, Supplying the South West Portal, https://www.supplyingthesouthwest.org.uk/ is the only portal that includes all the relevant documents required to respond to this opportunity, bearing Project Id: DN581639. No Tender submissions will be considered without completing the tender documents in full including attachments and returning them in alignment with the instructions within the tender documents.

Status: Awarded
Published Date: 11/11/2021
Closing Date: 02/11/2021
Value: £1,100
Winslow Centre - Geotechnical Investigation - DN572659 - Geotechnical Investigation Desk Study including site walkover

Status: Awarded
Published Date: 14/10/2021
Closing Date: 19/05/2021
Value: £104,500
T/HILL/367 - Ground Investigation (GI) Works - The Hillingdon Hospitals NHS Foundation Trust has appointed AECOM Limited to design a ground investigation suitable to support design of proposed redevelopment on site. The purpose of the investigation is to provide information to assess the geotechnical, geo-environmental, geological and hydrogeological ground conditions. The Hillingdon Hospitals NHS Foundation Trust sought to appoint a contractor who will be appointed as Principal Contractor for the ground investigation works. The Principal Contractor responsibilities include but are not limited to plan, manage, monitor and coordinate health and safety in the construction phase of a project. Phase 1 works comprises advance of 4 boreholes, 6 DCPs and 2 trial pits for infiltration testing as outlined in the specification.

Status: Awarded
Published Date: 04/06/2021
Closing Date: 08/03/2021
Value: neg.
London Highway Maintenance and Projects Framework - South Area - Single supplier framework agreement for highway maintenance and capital renewals and enhancements and associated works and services, across London, for use by TfL and other contracting authorities.

Status: Awarded
Published Date: 04/06/2021
Closing Date: 08/03/2021
Value: neg.
London Highway Maintenance and Projects Framework - North Area - Single supplier framework agreement for highway maintenance and capital renewals and enhancements and associated works and services, across London, for use by TfL and other contracting authorities.

Status: Awarded
Published Date: 04/06/2021
Closing Date: 18/03/2021
Value: neg.
London Highway Maintenance and Projects Framework - Central Area - Single supplier framework agreement for highway maintenance and capital renewals and enhancements and associated works and services, across London, for use by TfL and other contracting authorities.