75 Results (0.1 seconds)

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Open
Published Date: 10/05/2024
Closing Date: 10/06/2024
Value: £156,500
PLACE544H Bakewell Weir Footbridge General Repairs Scheme - The purpose of the works is to produce a maintenance package to repaint the structure and address any other maintenance issues e.g. resurfacing, inclusive of the removal of the lovelocks and prevention of re-attachment and delivery of the works.

Status: Awarded
Published Date: 08/05/2024
Closing Date: 05/04/2024
Value: £31,635
Hansby Gate Subway Lightwell Cover Slabs Replacement - Call off from the Bridge Maintenance & Masonry Repairs Framework 2023

Status: Awarded
Published Date: 30/04/2024
Closing Date: 23/02/2024
Value: £130,000
Old Sol's Footbridge, Billington. Coating System - LCC31074,2 - Works are required to Old Sol's Footbridge, Billington, BB7 9TW for preparation and application of a coating system. The works include scaffolding, encapsulation of the structure, removal of the existing paint system by dry blast cleaning followed by repainting works.

Status: Open
Published Date: 16/04/2024
Closing Date: 22/05/2024
Value: £180,000
Framework for Restricted Access Structural Inspections and Repair Works - Framework for Restricted Access Structural Inspections and Repair Works Lot 1: Underwater Dive Inspections and Confined Spaces Inspections Lot 2: Roped Access Inspections Lot 3: Remedial Works

Status: Awarded
Published Date: 06/03/2024
Closing Date: 28/02/2024
Value: £25,671
Hansby Gate Subway Lightwell Cover Slabs Replacement - Call off from the Bridge Maintenance & Masonry Repairs Framework 2023

Status: Awarded
Published Date: 05/02/2024
Closing Date: 08/12/2023
Value: £120,000
Holden Wood Bridge - Coating System - Works are required to Holden Wood Bridge, Holcombe Road, Rossendale, BB4 4QR for preparation and application of a coating system. The works include scaffolding, encapsulation of the structure, removal of the existing paint system by dry blast cleaning followed by repainting works.

Status: Open
Published Date: 24/01/2024
Closing Date: 23/02/2024
Value: £130,000
Old Sol's Footbridge, Billington. Coating System - LCC31074,2 - Works are required to Old Sol's Footbridge, Billington, BB7 9TW for preparation and application of a coating system. The works include scaffolding, encapsulation of the structure, removal of the existing paint system by dry blast cleaning followed by repainting works.

Status: Awarded
Published Date: 22/01/2024
Closing Date: 05/01/2024
Value: £46,799
Brick Arch Strengthening - Dumps Road - The Works are to strengthen the arch barrels to an old railway structure using the iGap system (or similar approved) and associated brickwork repairs. The structure is a three span, brick arch structure that carries Dumps Road over the Disused railway line in Whitwick, Leicestershire. Hammer tapping of the arch barrel has indicated sections of hollowness to all three arch barrels, indicating arch ring separation. The proposal is to stitch the arch rings together using helifix bars (or similar approved) and to fill any voids between the arch rings by means of resin injection. Brickwork repairs to the arch soffits, including cleaning, repointing and brick replacement will also be required.

Status: Awarded
Published Date: 09/01/2024
Closing Date: 15/12/2023
Value: neg.
Replacement of existing bridge with a new item that is suitable for vehicles up to 7.5 tones - AWARD - Replacement of existing bridge with a new item that is suitable for vehicles up to 7.5 tones