314 Results (0.1 seconds)

Status: Open
Published Date: 15/05/2024
Closing Date: Unknown
Value: £20,000,000
Measured Term Contract for Building, Mechanical & Electrical Works in relation to Fire Remedial Works (Fire Remedial Works) - 2gether Support Solutions Ltd, a wholly owned subsidiary company of East Kent Hospitals University NHS Foundation Trust, is issuing an Invitation To Tender ("ITT") in connection with a competitive procurement for Building, Mechanical and Electrical Works consisting of maintenance and works of alteration and improvement in relation to fire remediations (the “Works”) at the William Harvey Hospital in Ashford, The Queen Elizabeth, the Queen Mother Hospital in Margate and the Kent and Canterbury Hospital in Canterbury. <br/><br/>The Form of Contract will be the Standard Form of Measured Term Contract 2016 as issued by the Joints Contracts Tribunal.

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Awarded
Published Date: 15/05/2024
Closing Date: 14/11/2023
Value: £200,000
FIre Alarm, Emergency Equipment and Emergency Lighting Framework - ORE/23/080 - ORE Catapult are seeking a Contractor to maintain and test the Emergency Fire alarm systems, maintain and test the Emergency lighting systems, as well as supply, maintain and service emergency equipment within the Blyth site. This procurement exercise is focused on ensuring that buildings remain compliant with current and relevant legislation. If any future legislation regarding the use of fire equipment, alarms or emergency lighting is brought in, then the contractor shall ensure that all buildings are compliant with the new legislation.

Status: Open
Published Date: 29/04/2024
Closing Date: Unknown
Value: £6,500,000
Tower Bridge Fire Suppression Works - The City of London Corporation are tendering for a Principal Contractor to complete the RIBA stages 2 – 4 during a Pre-Construction Services Agreement for the Tower Bridge Fire Suppression Project. A feasibility study has been completed, which forms the Employer’s Requirements. The Principal Contractor will be responsible for submission of planning / listed building consents for the project; building control applications; and any other necessary applications / licenses to local and statutory authorities.

Status: Open
Published Date: 26/04/2024
Closing Date: Unknown
Value: neg.
Fire Compartmentation Project - Selwood Housing Society Limited is a charitable social enterprise based in Trowbridge, Wiltshire. The organisation owns and manages over 7,000 homes for rent and shared ownership in the south west. The project will cover approximately 230 blocks from 1 to 4 storeys. It's anticipated the work will be delivered over 48-60 months. The value attributed to this project is estimated, as are the details and Selwood Housing Society Limited reserve the right to change anything listed in this notice. The scope of works for the project will include. - Assuring compliance to applicable Regulations, codes and guidance - Project and Contract Management - CDM 2015 Compliance - CDM 2015 Appointed Duty Holder responsibilities - Principal Contractors duties / and or management - Health and Safety Management - Scheme risk analysis. - Initial Project evaluation - Risk / Information Gap Analysis - Management and instruction of fire plans to include compartment drawings, fire strategies. - Identification and ability to understand / determine the individual requirements of the existing building and design of Fire Compartmentation requirements. - Asbestos management including scoping, instruction of Asbestos refurbishment and Demolition services, Asbestos removals. - PFP system Specifications - Executive summary and proposals for installations of Passive Fire Protection installations - Waste management. - Environmental cleans. - Development of/ installation/ undertaking/instruction SSOWs - Installations of PFP systems to include partitions & barriers, - Fire door sets and FR Hatches - Installation of fire dampers within ductwork / ventilation systems - Cavity closing systems. - Compartment Surveys and schedules of works. - Application of fire-resistant coatings, sealants, and mortars to building materials, penetrations, and joints - Application of fire-resistant coatings or wraps to structural steel elements, such as columns, beams. - Third Party Accreditation / Approved Installers.

Status: Open
Published Date: 15/04/2024
Closing Date: 14/05/2024
Value: £285,000
REPLACMENT FIRE RATED & NON-FIRE RATED TIMBER DOORSETS, DOOR ASSEMBLIES & DOOR LEAVES & ASSOCIATED WORKS - REPLACMENT FIRE RATED & NON-FIRE RATED TIMBER DOORSETS, DOOR ASSEMBLIES & DOOR LEAVES & ASSOCIATED WORKS

Status: Awarded
Published Date: 12/04/2024
Closing Date: 14/11/2023
Value: £200,000
FIre Alarm, Emergency Equipment and Emergency Lighting Framework - ORE/23/080 - ORE Catapult are seeking a Contractor to maintain and test the Emergency Fire alarm systems, maintain and test the Emergency lighting systems, as well as supply, maintain and service emergency equipment within the Blyth site. This procurement exercise is focused on ensuring that buildings remain compliant with current and relevant legislation. If any future legislation regarding the use of fire equipment, alarms or emergency lighting is brought in, then the contractor shall ensure that all buildings are compliant with the new legislation.

Status: Open
Published Date: 10/04/2024
Closing Date: 13/05/2024
Value: neg.
ITT for the Provision of Fire Safety Reactive Works - This tender is designed to deliver responsive repairs and ad-hoc replacements to fire safety equipment and systems such as fire doors, automatic smoke vents, fire alarms and emergency lighting, the contract is necessary to remain compliant with fire safety regulations such as the Fire Safety Regulations 2022, Fire Regulatory Reform Order 2005 Safety and The Building Safety Act 2022, in addition to multiple British Standards in relation to fire safety. The tender will be split into 3 geographical lots, North (covering North West, North East and Yorkshire), East and South. The successful contractor(s) will have a proven track record of providing these services/works. The initial contract period will be 24 months, with the options to extend based on 2 x 12 month extension periods - subject to performance. All correspondence regarding this Tender must be via the In-tend portal, no emails will be responded to.

Status: Open
Published Date: 10/04/2024
Closing Date: Unknown
Value: neg.
Tower Bridge Fire Suppression Works - 1. Replacement of the existing fire suppression system in the Towers with a new fire suppression system, recommended to be a standard sprinkler (water) system and which will cover: a. The Towers b. The Walkways c. The Abutments d. The Engine Rooms and Shop (museum on the south shore) 2. Possible refurbishment or replacement (to be confirmed) of the existing gas suppression system in the machine rooms (northeast, northwest, southeast, southwest) 3. Connecting the fire suppression systems to the BMS 4. Boosting the water mains and domestic water supplies to support the new fire suppression system (to include infrastructure upgrades with Thames Water and the coordination of that) 5. Placement of the fire suppression tanks in the recommended location (currently under investigation)

Status: Open
Published Date: 26/03/2024
Closing Date: 16/04/2024
Value: neg.
Early Market Engagement _ Fire Compliance 2024 - believe housing are looking to undertake an early market engagement event with suppliers for our forthcoming Fire Compliance tender. This will take place at our Head Office, Seaham on Thursday 18th April 2024 . If you are interested in attending/would like to complete our early market engagement questionnaire to support this process, please email procurement@believehousing.co.uk