1,136 Results (0 seconds)

Status: Awarded
Published Date: 07/02/2024
Closing Date: 05/01/2024
Value: £76,689
Long Leys Bungalows 4 & 5 Alteration Works - Building alterations Long Leys Bungalows 4 & 5

Status: Open
Published Date: 06/02/2024
Closing Date: 07/03/2024
Value: £1,400,000
Measured term contract for planned preventative maintenance with reactive repairs and minor works for building fabric and mechanical and electrical works - The University of Portsmouth (the Authority) is seeking to award two measured term contracts for the planned preventative maintenance with reactive repairs and minor works for building fabric (Lot 1) and mechanical & electrical works (Lot 2). The annual values for Lots 1 and 2 are anticipated to be approximately £400,000 and £1,400,000. The two contracts may be awarded to the same contractor or two different contractors. An Applicant can apply for Lot 1, Lot 2 or both Lots (see question 1.4). This standard Selection Questionnaire (SQ) is being issued in connection with a competitive procurement conducted in accordance with the Restricted Procedure under the Public Contract Regulations 2015 and the Public Procurement (Amendment etc) (EU Exit) Regulations 2020 ("the Regulations"). Procurement Timetable Task Date Contract notice published on FTS 06/02/2024 Selection stage documents available on In-tend 06/02/2024 Deadline for requests for selection stage clarification 29/02/2024 SSQ return deadline 07/03/2024 Selection decision notified to candidates 04//04/2024 Invitation to tender issued to shortlisted tenderers 05/04/2024 Deadline for requests for tender stage clarification 30/04/2024 Tender return deadline 07/05/2024 Invitation to interview (if required) 30/05/2024 Interview period 04/06/2024 and 05/06/2024 Award decision notified to tenderers 17/06/2024 Standstill period starts 17/06/2024 Standstill period ends 27/06/2024 Contract award 28/06/2024 Mobilisation 25 Days Start of contract 01/08/2024 Whilst the University will endeavour to follow this timetable it could be subject to change. Tenderers can register and download all relevant documentation from our Intend portal https://in-tendhost.co.uk/port/aspx/Home

Status: Open
Published Date: 06/02/2024
Closing Date: Unknown
Value: neg.
Measured term contract for planned preventative maintenance with reactive repairs and minor work for building fabric and mechanical and electrical works - The University of Portsmouth (the Authority) is seeking to award two measured term contracts for the planned preventative maintenance with reactive repairs and minor works for building fabric (Lot 1) and mechanical and electrical works (Lot 2). The annual values for Lots 1 and 2 are anticipated to be approximately £400,000 and £1,400,000. The two contracts may be awarded to the same contractor or two different contractors. An Applicant can apply for Lot 1, Lot 2 or both Lots (see question 1.4).This standard Selection Questionnaire (SQ) is being issued in connection with a competitive procurement conducted in accordance with the Restricted Procedure under the Public Contract Regulations 2015 and the Public Procurement (Amendment etc) (EU Exit) Regulations 2020 ("the Regulations").

Status: Closed
Published Date: 02/02/2024
Closing Date: Unknown
Value: neg.
Maintenance Of Building Energy Management System Installations - The Council's Housing and Technical Resources Property Service have an ongoing requirement for a specialist contractor to provide a maintenance service for the Building Energy Management System (BEMS) and Under Floor Heating (UFH) within South Lanarkshire across a number of establishments including Council buildings, education and social care settings. Maintenance of both the BEMS and UFH is essential to ensure that there is: - The optimum performance of the equipment controlled - Provision of thermal comfort levels to the working environment for the occupants of South Lanarkshire Council’s properties - Effective control of energy consumption, for energy efficiency purposes. The maintenance of the works requires specialist skills and therefore the contract is split into four separate lots. These lots reflect the main types of equipment in use as follows: Lot 1 - Trend Controllers Lot 2 - Siemens Controllers Lot 3 - Various Controllers Lot 4 - Under Floor Heating The contract will be procured via open procedure on the most economically advantageous tender (MEAT) criterion as a single source award per lot, which enables the Council to take account of criteria that reflect qualitative, technical, and sustainable aspects of the tender submission as well as price when reaching a decision. The Council has adopted a sequential opening process for any tender exercise conducted per the following stages: As part of Stage 1 the bidders will be required to complete a Single Procurement Document (SPD) as part of the Qualification envelope self-declaring that they meet the criteria requirements for the Lot(s) they have selected. As part of Stage 2 the bidders will then be required to complete a Technical response based on technical specific questions related to the lot they have selected. As part of Stage 3 the bidders will then be required to complete Commercial response based on activities associated to the lot they have selected. As part of the tender evaluation process the Council will then request evidence from the bidder identified as having the highest MEAT prior to award. The contract will be governed under the JCT Measured Term Contract (MTC/Scot) 2011 Edition.

Status: Open
Published Date: 02/02/2024
Closing Date: 04/03/2024
Value: £835,000,000
NOE CPC Specialist Estates Engineering & Maintenance Services (Hard FM) - The purpose of this procurement is to establish a framework for the provision of Specialist Estates Engineering & Maintenance Services (Hard FM). The framework will provide a one stop shop for organisations to fulfil their Specialist Estates Engineering & Maintenance Service (Hard FM) requirements, with suppliers selected for their experience and ability to provide customers with a comprehensive range of services and works that combine quality, value and compliance. The framework has been designed to facilitate current trends in FM and also to provide a flexible route for Estates and FM departments within contracting authorities to procure services. The framework Lots have been configured to enable Service Providers to be able to bid for areas within their specialism, making it friendly for SME's. Service Providers have the option of bidding for one or more Lots within the framework, with NOECPC appointing up to 12 Service Providers for each Lot. Lot 1 - Airconditioning, Air Handling Units and Refrigeration Lot 2 - Asbestos Removal Lot 3 - Automatic Doors and Roller Shutters Lot 4 - Electrical Works Lot 5 - Fire Alarm, Emergency Lighting and Fire Fighting Equipment Lot 6 - Fire Risk Assessments Lot 7 - Fire Stopping, Compartmentation and Associated Works Lot 8 - Heating and Plumbing Systems Lot 9 - Lifts, Hoists and Escalators Lot 10 - Lightning and Fall Protection Systems Lot 11 - Medical Gas Systems Lot 12 - Security Systems Lot 13 - Standby Power Systems Lot 14 - Water System Maintenance and Risk Management Lot 15 - Renewable & Low Carbon Heating Systems Lot 16 - Solar PV Lot 17 - General Building, Improvements, Installations, Repairs & Maintenance Lot 18 - High Secure (Forensic) FM Services Lot 19 - Managed FM Service This procurement exercise will be conducted on the Atamis Health Family Single e-Commercial System at: https://health-family.force.com/login

Status: Awarded
Published Date: 01/02/2024
Closing Date: 05/12/2023
Value: neg.
1998 FC19 FW - LSB Small Works and Alterations - AWARD - Competition under the UoN 1998 framework for refurbishment works

Status: Awarded
Published Date: 01/02/2024
Closing Date: 11/01/2024
Value: £54,126
T-Levels - refurbishment works to classrooms L8, 9 & 10, Bicton College - Light touch refurbishment of Rooms L8, L9 and L10, Learning Resources, Hayter Hames Building. Product/Service Specifications: • Replacement ceiling grid and tiles in all three rooms. • Replacement LED lighting in all three rooms. • Replacement three compartment trunking in all rooms. • New DDA Regs compliant sockets and data outlets to be fitted. • Repainting of all walls in all three rooms. • Repainting of all skirting boards in all three rooms. • New floor covering in all three rooms. Please refer to the product specification document for more details. • Servicing of all windows and fire doors. • All electrical circuits to be tested and certified. • All data circuits to be tested and certified. • All fire door remedials to be certified. • Please refer to the product specification document (Product Specifications - Bicton L8 L9 & L10) for product details and paint finishes.

Status: Awarded
Published Date: 01/02/2024
Closing Date: 31/01/2024
Value: £73,261
COLP New Street Training Room Goods and Installation - Mini-competition awarded to Eveque Leisure Equipment Ltd for COLP New Street Training Room Goods and Installation.

Status: Closed
Published Date: 31/01/2024
Closing Date: Unknown
Value: neg.
Maintenance of Building Management System - Northern Lincolnshire and Goole NHS Foundation Trust is contracting for the provision of maintenance service of Building Management System across the Trust's three sites. The contract is intended to remain in place for five years.

Status: Awarded
Published Date: 31/01/2024
Closing Date: 06/11/2023
Value: neg.
Maintenance of Building Management System - Northern Lincolnshire and Goole NHS Foundation Trust is contracting for the provision of maintenance service of Building Management System across the Trust's three sites. The contract is intended to remain in place for five years.