35 Results (0 seconds)

Status: Awarded
Published Date: 22/01/2024
Closing Date: 21/11/2023
Value: £184,728
North Bridge Level 2&3 Assessment - Direct award to the single supplier Mason Clarks Associates via Lot 1a of the professional services framework to deliver North Bridge Level 2&3 Assessment.

Status: Awarded
Published Date: 13/12/2023
Closing Date: 01/12/2023
Value: £35,838
Design and Specification of the Scott Street Interpretation Scheme - Hull City Council has appointed Mason Clark Associates using Direct Award with Lot 1a of EPRS Framework under a NEC4 Professional Services Short Contract to provide detailed designs to assist the Client in complying with conditions 7 & 8, identified in planning approval ref. 18/01049/FULL - Proposed dismantling of Scott Street Bridge and provision of a scheme for replacement leafs and enhancement and conservation of the bridge approaches. The Services are to commence 8th December 2023, end date 7th November 2024.

Status: Awarded
Published Date: 13/12/2023
Closing Date: 22/11/2023
Value: £28,862
Consultation Extras for Priory Drive Footbridge - Hull City Council has appointed Mason Clark Associates Limited to provide additional services required for Priory Drive Footbridge through a call off via direct award by rotation from Lot 1a the Engineering and Regeneration Professional Services Framework. Services are to commence 1st December 2023, end date 30th November 2024.

Status: Awarded
Published Date: 07/12/2023
Closing Date: 07/11/2023
Value: neg.
Crosby New Bridge - Design & Build New Deck & Parapets - A further competition through the Civil Engineering Contractors Framework 2021 (CECF2021) agreement under lot 1 to replace Crosby New Bridge's Deck and Parapets with New Precast RC Concrete Beams, Concrete Deck and VRS parapet and aim to increase height above the river as much as possible, whilst keeping the weight of the new bridge as low as possible.

Status: Awarded
Published Date: 06/12/2023
Closing Date: 26/04/2023
Value: £1,000,000
HCC - 03/23 - The Provision of Transport Infrastructure and Planning Services Framework (2023) - AWARD - Following a procurement, Hertfordshire County Council has awarded contracts for the Provision of Transport Infrastructure and Planning Services Framework (2023). This is an award notice and this opportunity is now closed. The successful suppliers are - Lot 1: WSP UK Limited Lot 2: AECOM Limited, Arcadis Consulting (UK) Limited, Norman Rourke Pryme Limited, Ramboll UK Ltd, WSP UK Limited Lot 3: AECOM Limited, Ove Arup & Partners Ltd, Stantec UK Limited, SYSTRA Limited, WSP UK Limited Lot 4: Civic Engineers Limited, Norman Rourke Pryme Limited, Ove Arup & Partners Ltd, Project Centre Limited, WSP UK Limited Lot 5: Project Centre Limited Lot 6: AECOM Limited, Ricardo-AEA Limited Lot 7: AECOM Limited, Pell Frischmann Consultants Ltd, WSP UK Limited Lot 8: AECOM Limited, Arcadis Consulting (UK) Limited, SYSTRA Limited Lot 9: RPS Consulting Services Ltd, WSP UK Limited The estimated total value of the Contract is £12180000.00 and is for the core Contract period and also includes the approximate value for extensions. The initial term of this contract is three (3) years with a possible extension of up to a further one (1) years at the Councils discretion. FTS/OJEU Contract Notice Number: 2023/S 000-006453 FTS/OJEU Award Notice Number: 2023/S 000-035987

Status: Awarded
Published Date: 25/09/2023
Closing Date: 22/09/2023
Value: £31,025
The Design and Associated Services Relating to a Scheme to Temporary Strengthen Priory Drive Footbridge - Hull City Council has appointed Mason Clark Associates through a call off via direct award by rotation from Lot 1a the Engineering and Regeneration Professional Services Framework to provide the following the design and associated services relating to a scheme to temporary strengthen Priory Drive Footbridge. The services identified will be provided at a total cost of £31025.00. The Services are to commence 2nd October 2023, end date 2nd October 2024

Status: Awarded
Published Date: 05/09/2023
Closing Date: 19/07/2023
Value: £107,343
Logistic Support Bridge (LSB) In-Service Support Contracts Finder - Awarded Contract - This Contract Award Notice (CAN) is to announce that Acrow Global Ltd (trading as Mabey Bridge) have been awarded a 5-year single source framework Contract for the provision of in-service support to the MOD's fleet of Logistic Support Bridges (LSBs). This covers the period from 04-September 2023 to 03-September 2028 (5 years) - noting that the Authority has no obligation to place any tasking during this period. The expected minimum value of the Contract is £29,000, with an approval of up to £107,342.94 for provision of PDS tasking. This could include, but not be limited to, activities such as: design or technical support; management of drawings/artwork; ad-hoc meetings; improvement or modification of the bridge design, attendance at the Project Safety Environmental Panel (PSEP); support to Safety Management; Post Design Services (PDS); Provision of Customer Support. This CAN is published on Contracts Finder due to the Contract value falling below the DSPCR 2011 threshold.

Status: Closed
Published Date: 06/03/2023
Closing Date: 26/04/2023
Value: £1,000,000
HCC - 03/23 - The Provision of Transport Infrastructure and Planning Services Framework (2023) - Hertfordshire is entering a period of historic growth, with 100,000 more homes, 100,000 more jobs, and a 15% increase in traffic envisaged during the next 15 years. The Council and its partners have a responsibility to plan positively for this, addressing the challenges this creates by shaping this growth to 2031 and beyond. To this end, the Council has adopted a number of strategies outlining its response to these challenges, most notably the Local Transport Plan 4. Aiming to achieve a step change in travel behaviour by setting the framework for sustainable development and mode shift in Hertfordshire, its successful delivery requires a unified, collaborative approach both within the Council and with its partners. The Services detailed in the Specification, refined through market testing, aim to provide the Council and its partners with the breadth of expertise and experience required to ensure 'good growth' in Hertfordshire. Ranging from initial spatial planning work through to design and development of major infrastructure, as well as the modelling work, transport appraisals, and environmental assessments required in between, many of the outlined services will sit alongside in-house staff or existing providers. Nonetheless, as demand for these Services grows over the next 4 years, a diverse range of suppliers will be beneficial, bringing innovation and fresh perspectives to the growth agenda in Hertfordshire. The Services have been broken into the following Lots and it is the intention of the Council to award each Lot to a maximum number of suppliers per Lot as detailed below. Following the outcome of the Evaluation, should there be a joint third or fifth position the council will take into account the Price score in order to determine the top 3/5 successful Tenderers per Lot. The Framework Agreement has broken down in to the following Lots. Lot No Lot Title Maximum No of Successful Tenderers per Lot Lot 1 Spatial Planning - Transport Strategy, and Early-Stage Scheme Development 1 Lot 2 Spatial Planning - Active Travel Early-Stage Scheme Development 5 Lot 3 Modelling Services 5 Lot 4 Development Management - Planning 5 Lot 5 Development Management - Implementation & Site Supervision 3 Lot 6 Environmental Support 3 Lot 7 Delivery - Major Transport Schemes 3 Lot 8 Delivery ...

Status: Closed
Published Date: 16/01/2023
Closing Date: 10/02/2023
Value: neg.
HCC - 01/23 - Pre-Procurement Market Engagement (PPME) for the Provision of Transport Infrastructure and Planning Services - Hertfordshire County Council (the "Council") is carrying out Pre-Procurement Market Engagement ("PPME") for the provision of Transport Infrastructure and Planning Services The Council is seeking input from the market as to what might be the most attractive way of packaging and scoping any future opportunity for contracts. This input will help inform any resultant procurement process. The Council will consider the feedback received to help inform the Council's options and further decision making. For the avoidance of doubt, this stage of the project is not part of a formal procurement process, and the Council is not committing, at this stage, to carrying out such a process. Participation or non-participation in the PPME shall not prevent any supplier participating in a potential future procurement, nor is it intended that any information supplied as part of the PPME shall place any supplier at an advantage in a potential procurement process. Participation in the PPME will be at each organisation's own cost. No expense in responding to this PPME will be reimbursed by the Council. Further information can be found within the attached documentation. You are invited to submit a completed questionnaire by 12 noon on 10th February 2023

Status: Closed
Published Date: 21/10/2022
Closing Date: 04/11/2022
Value: £90,000
Improving fish passage and natural river function on a Highways site - The purpose of this brief is to seek the services of an experienced Consultant to address the ford at Butter Beck within the River Esk catchment to create a more naturally functioning river and to improve fish passage. This site is a Highways site so the Consultant will need to be experienced in working with Highways Departments to deliver environmental sensitive infrastructure improvements to highways, likely via a S278 agreement. The consultant will: 1 Produce detailed design drawings to satisfy all consenting and Highways requirements, including contractor installation method 2 Obtain Technical Approval from NYCC Highways Department for proposed design 3 Obtain all consents required to undertake the works, likely to include but not limited to: S278 agreement; updating previously submitted Land Drainage Consent application; providing design and advice to Blue Corridors Project Officers to enable reconsult on planning application for variation to work; prepare and obtain Street Works permit along with a diversion plan 4 Procure contractor 5 Arrange and undertake site visits as required, such as with Project Officers, procured contractor and landowners adjacent to the site 6 Deliver Project Management role and provide additional advice as required to deliver the Works in full