13 Results (0 seconds)

Status: Closed
Published Date: 02/02/2024
Closing Date: Unknown
Value: neg.
Supply of Export Transformer - There are two export transformers in service at the site, both were manufactured by Ferranti In 1968. Each transformer is complete with an on-load tap-changer comprising 19 taps, with tap 13 being nominal tap. The voltage range is 39.6 kV to 29.7 kV with 1.67% taps. The transformer connections are bushings at 33 kV and cable at 11 kV. The services are for the design, manufacture, testing, and delivery to site of an export transformer for the Edmonton EfW plant in London. This new transformer and associated marshalling kiosk will replace the existing original transformer and marshalling/control panel.

Status: Awarded
Published Date: 23/10/2023
Closing Date: 18/09/2023
Value: £55,820
UKRI-3401 Rental of 2x Temp Transformers - Emergency Rental of 2x Temporary Transformers onsite at Daresbury Laboratory

Status: Awarded
Published Date: 17/08/2022
Closing Date: 02/08/2022
Value: £29,528
GB-Cambridge: UKRI-2354 BAS Aquarium Transformer - Provision of 110V Transformer for Polar Aquarium

Status: Closed
Published Date: 17/06/2022
Closing Date: 01/07/2022
Value: £9,000
P257 - Development & Certification of High Power Supply Unit - We are seeking to appoint a suppliers to provide support in the development and certification of a high voltage power supply unit. This opportunity will be undertaken through an NDA and is split into two lots as outlined below. No further detail will be released until the NDA has concluded. Lot 1 - Communication software for systems Lot 2 - Test procedures and conformity to British Standard (BSI)

Status: Closed
Published Date: 26/11/2020
Closing Date: 10/12/2020
Value: neg.
Replacement Transformer 3 - Solihull hospital - To supply and install replacement HV transformer 11kv to 415v as a direct replacement for transformer 3. These works to be carried at agreed time and within approved timescales. 1. Source and deliver to site 800kva eco transformer. 2. Isolate the existing Transformer and certify as safe to work. 3. With phasing marked remove the HV and LV cables, protect whilst transformer is being replaced. 4. Remove all earthing . 5. Remove Transformer 3 from the substation. 6. install a new ECO TIER 800kVA transformer or equivalent wound with compatible vectors to be compatible for parallel connection to Transformer No4 if required. 7. Replace the HV and LV cables, Replace all earthing, Test and commission with 4hr soak test.

Status: Closed
Published Date: 30/10/2020
Closing Date: 13/11/2020
Value: £10,000
Manufacture and Supply of Wiring Loom for use in 100KV extra high tension (EHT) high voltage (HV) po - A SparkFund Business would like to commission the services of a suitably qualified and experienced supplier for the Manufacture and Supply of Wiring Loom for use in 100KV extra high tension (EHT) high voltage (HV) power supply unit

Status: Closed
Published Date: 14/08/2020
Closing Date: 28/08/2020
Value: £5,000
High Voltage Power Supply Unit - High Voltage Power Supply Unit

Status: Closed
Published Date: 12/11/2019
Closing Date: 12/11/2019
Value: £400,000
ON-HOLD: LEM005d ITT for a battery energy storage system (BESS) providing both UPS capability and grid ancillary services for a commercial site in mid Cornwall - THIS PROCUREMENT EVENT IS ON HOLD UNTIL FURTHER NOTICE. This project is part of the wider Cornwall Local Energy Market Programme in Cornwall. The scope of this Invitation to Tender (ITT) is to procure a BESS to provide both Uninterruptible Power Supply (UPS) capability and selected grid services, which will be located Behind The Meter (BTM) at a Commercial site in mid Cornwall. The scope includes the design of the BESS; execution of transport, offloading, installation, commissioning, testing and sign off/certification, in addition to providing an operation and maintenance service. System sizes could range from: 150kW x 75kWh to 250kW x 125kWh. Centrica plc's Cornwall Local Energy Market project (LEM) is an EU-funded initiative involving the development of a virtual energy marketplace. The trial provides homes and businesses with the technology and a software platform to buy and sell energy and flexibility to both the supply networks and the wholesale energy market. The project's overarching aim is to demonstrate that the electricity distribution network can facilitate an increased penetration of renewable / low carbon electricity generation by invoking novel strategies including flexibility. The LEM project will enable energy asset flexibility in the most constrained areas on the distribution network in Cornwall. To this end the project is installing low carbon energy generation assets, such as natural gas CHP, renewable energy generation, storage, private wire networks, and demand-side response technologies into selected industrial and commercial premises in Cornwall. The full Invitation to Tender will become available after you complete an NDA and register your interest as per the instructions below: Please complete the attached two forms, ARIBA COMPANY INFORMATION and CENTRICA PLC NDA and include these when requesting an ITT pack. The SAP Ariba invitation will be sent via CENTRICA GLOBAL PROCUREMENT email address: s4system-prodeu@eusmtp.ariba.com by 14 November 2019 (unless your initial request is later than this date). Please check your spam before contacting us and then add this email address to your security safe list as all communications regarding this tender will be sent via Ariba. Note: ITT packs will continue to be sent out up to the 'Questions Portal' deadline, shown below in the tender timeline: ITT advertised on ContractsFinder: Monday 4th November ITT pack request deadline: Thursday 14th November 2019 Opportunity to attend a site visit: TBC Centrica issue tender pack to tenderers: 14th November 2019 up to questions portal deadline Questions portal deadline/confirm intention to bid: Thursday 28th November 2019 12:00 GMT Tender returns: Monday 2 December 2019 12:00 GMT Scoring and selection: 2-6 December 2019 Contracting: January 2019

Status: Closed
Published Date: 17/10/2019
Closing Date: 01/11/2019
Value: £23,500
Development of a 120kV high voltage power supply R&D/036 P-130 - A SparkFund Business would like to commission the services of a suitable qualified and experienced supplier for the development of a 120kV high voltage power supply. Please note this exercise requires the submission of an NDA.

Status: Closed
Published Date: 29/06/2018
Closing Date: 13/07/2018
Value: £65,000
Replacement of Industrial Zone 750KVA Transformer & Provision of New HV Ring Main - The project comprises the replacement of the existing 1970 Bonar, Long & Co. 750KVA transformer located in an external compound in the Industrial zone at the Kent and Canterbury Hospital in Canterbury. In addition, a Ring Main Unit is to be provided to serve the new transformer and allow for future extension of the HV infrastructure at that end of the site. This replaces an existing HV switch which has already been removed and temporary cabling installed in anticipation of this project. It is the intention that this project be completed at the latest by the mid of October 2018