57 Results (0 seconds)

Status: Awarded
Published Date: 23/04/2024
Closing Date: 28/02/2024
Value: £59,240
Supply of PLC Instrumentation - A direct award contract has been awarded by NRS Dounreay for the Supply of PLC Instrumentation.

Status: Awarded
Published Date: 16/04/2024
Closing Date: 01/03/2024
Value: £50,000
CEFAS24-58 Contract for provision of service and maintenance of Clearwater Sensors equipment - Provision of service and maintenance including routine refills for Cefas' Clearwater Sensors, for monitoring seawater nutrients.

Status: Awarded
Published Date: 11/04/2024
Closing Date: 06/02/2024
Value: £80,757
HFC-8 WITH ALPHA BETA PLASTIC DETECTORS - HFC-8 WITH ALPHA BETA PLASTIC DETECTORS

Status: Closed
Published Date: 11/04/2024
Closing Date: Unknown
Value: neg.
Automatic Precipitation Sampler DRA-12 - The purchase of 4<br/>Automatic Precipitation Sampler DRA-12

Status: Awarded
Published Date: 13/03/2024
Closing Date: 27/02/2024
Value: £11,716
APHA CapEx (23/24): Mini 96 Pipette - Supply of 1 x Mini 96 Pipette, including a 12-month warranty and a one (1) year preventative and corrective maintenance

Status: Awarded
Published Date: 09/02/2024
Closing Date: 06/12/2022
Value: £2,500,000
HS2 Main Works S1 & S2 - WP023 - Crane Maintenance - Skanska Costain Strabag Joint Venture (SCSJV) are seeking supply chain partners to provide crane maintenance services for the HS2 Main Works Civils Contract Area Central. The Subcontractor provides all management, people, equipment, plant and materials, consumables (including fuels) and any other resources necessary to carry out and complete the items below. Timing of work to be agreed 4 weeks prior to planned commencement. LOLER thorough examination of each crane (e.g., https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm). Periodic LOLER thorough examination according to LOLER requirements Including but not limited to: ­Wear checks and measurements on brakes, ropes, mechanical and electrical components ­Visual inspections and functional checks of all components, including but not limited to brakes and safety devices ­All brakes are visually inspected thus ensuring that the brakes are working efficiently and without undue wear. ­Visual checks for defects - all components. ­Visual structural inspection of the crane. ­Non-destructive testing, load testing and other tests as deemed appropriate by the competent person. ­Disassembly or internal examination of parts as required to conduct the above examination items. ­Any other checks as specified by the manufacturer. Report of inspection as per LOLER requirements (e.g. LOLER Schedule 1: https://www.legislation.gov.uk/uksi/1998/2307/schedule/1/made). Immediate notification to Contractor of any defects noted to be a danger to people. Schedule of examinations to be every 6 months initially (following examination at commissioning) then adjusted as needed according to as per a competent person recommendation taking into account the work environment and historical findings. Adhoc inspections maybe required in the event of exceptional circumstances (e.g. damage). Bimonthly servicing (every two months). This may be adjusted should the servicing reports indicates more, or less frequent inspections are required. Upon completion a detailed report to be provided to the Contractor. Quote for remedial works associated with any defects identified to be provided. Servicing to consist, as a minimum, of the following: ­Wear and other defect checks of load ropes ­All safety devices are checked for correct operation and adjusted as required ­All electrical components are checked for wear, cleaned, and adjusted where necessary. ­All brakes are adjusted to the correct settings, thus ensuring that the brakes are working efficiently and without undue wear. ­All safety devices are checked for correct operation and adjusted if required. ­All mechanical components are checked for wear. ­Full lubrication program as per OEM and/ or industry recommendations Subcontractor to provide a breakdown response service which includes out of hours unscheduled onsite work and over the phone assistance. This service to be provided 24x7 unless otherwise agreed.

Status: Open
Published Date: 18/01/2024
Closing Date: Unknown
Value: £161,200,000
IF009A - Instrumentation, Control and Automation (ICA) Equipment and Spare Parts - This Contract is for the supply and delivery of Instrumentation, Control and Automation (ICA) equipment and spare parts The Contract is split into 8 lots, these being: • Lot 1 – Supply and delivery of Magnetic Flowmeter Equipment and Spare Parts • Lot 2 – Supply and delivery of Ultrasonic Flow Measuring Equipment and Spare Parts • Lot 3 – Supply and delivery of Ultrasonic Level Measuring Equipment and Spare Parts • Lot 4 – Supply and delivery of Chlorine Measuring Analytical Equipment and Spare Parts • Lot 5 – Supply and delivery of Turbidity Measuring Analytical Equipment and Spare Parts • Lot 6 – Supply and delivery of Dissolved Oxygen Analytical Equipment and Spare Parts • Lot 7 – Supply and delivery of Mixed Liquor Suspended Solids Analytical Equipment and Spare Parts • Lot 8 – Supply and delivery of Multi parameter Analytical measurement instrument and Spare Parts Please see draft specification and PQQ instructions for further information.

Status: Awarded
Published Date: 17/01/2024
Closing Date: 04/04/2021
Value: £10,000,000
EKFB JV - Framework Opportunity for the Route wide Construction Ground Movements Monitoring - EKFB JV is seeking to appoint numerous Instrumentation and Monitoring Subcontractors on a framework basis to supply, install and maintain the specified instrumentation for the period required. The purpose of I&M is to support pre-construction and construction phases of approx. 90 assets including cuttings, embankments, viaducts and green tunnels across the 80km trace and to manage the geotechnical risk associated with the soil-structure interaction. There is also an opportunity for the monitoring of additional assets within the mentioned main assets including overbridges/underbridges and retaining walls. The scope will include drilling of boreholes and installation of three main type of sensors: Piezometers, Inclinometers and Extensometers. The Subcontractors will be required to combine manual and automatic solutions, hence dataloggers will also to be installed within the boreholes to remotely record readings at agreed specified intervals. The planned start of the construction phase is 1st June 2021 and will last over 4 years period.

Status: Awarded
Published Date: 01/11/2023
Closing Date: 20/06/2023
Value: £80,000
GB-Cambridge: UKRI-3107 Gravity System for UAV - Gravity System for UAV

Status: Closed
Published Date: 26/10/2023
Closing Date: Unknown
Value: neg.
Instrumentation - Scottish Water (SW) is looking for Instrumentation contractors. The scope of works will include, but will not be limited to, the supply of instrumentation and instrumentation systems. The instrument selection will be based on the SW Approved List of Instruments. The scope shall also include for modular assembly and instrument backboard design, design guidance, instrument selection and guidance on instrument selection, factory assembly, installation, commissioning, testing, calibration, maintenance, repair, training and servicing for all SW’s water and wastewater treatment and distribution control and monitoring instrumentation. There are existing SW backboard designs for a selection of instruments which will continue to be the basis of the supply.