140 Results (0 seconds)

Status: Open
Published Date: 22/04/2024
Closing Date: 22/05/2024
Value: neg.
Provision for Ice Centre External Cladding Snagging Rectification Works - Lee Valley Regional Park Authority ("the Authority") requires various trades to undertake handover snagging rectification works based on a schedule of day rates and on costs at the newly built Lee Valley Ice Centre (LVIC). Numerous general snagging items still remain and need to be addressed; therefore, the Authority plans to group all snags relating to the External Wall/ Window/Door Cladding into a single package for tendering purposes.

Status: Open
Published Date: 26/03/2024
Closing Date: 16/04/2024
Value: neg.
Operation Ouch! Exhibition deinstall services - Operation Ouch! is an exhibition produced by SIM in collaboration with the BBC and 141 Productions, based on the CBBC's award-winning TV show of the same name. The exhibition comprises a number of different component elements, including partition walls, exhibition setworks, display cases, interactives, lighting and electrics, graphics, models and props. The exhibition has a yearlong exhibition run at SIM, due to close on 9th June 2024. SIM seeks to appoint a Main Contractor to perform the deinstallation at SIM.

Status: Open
Published Date: 16/02/2024
Closing Date: 01/03/2024
Value: £130,000
Substation Building - This notice is to advertise the Brickwork works to the substation for the A63 Scheme inclusive of labour, plant and material. The substations is in a part build condition and the works include the supply and install a of a green roof and guardrails. The anticipated start date for the installation on site is June 2024. Please email A63expressionofinterest@balfourbeatty.com, stating the package you want to express interest in and your company name. Please note any interested Contractors will need to hold a valid Constructionline Gold Membership and be willing to maintain the accreditation's validity throughout the duration of the project. Please note, the package value listed on this notice is approximate and subject to change.

Status: Awarded
Published Date: 16/02/2024
Closing Date: 04/02/2024
Value: £42,418
BIAS - M&E repairs - Essential mechanical works at the Bedford Athletics Stadium that are currently ongoing. The works commenced in early January to address a variety of mechanical works to address Health and Safety risks (e.g. legionella), servicing of plant and equipment including consequential remedial works due to lack of servicing and maintenance by Fusion and their failure to meet statutory obligations

Status: Open
Published Date: 31/01/2024
Closing Date: 16/02/2024
Value: £120,000
240122 - AOC Refurbishment Works at Hellesdon Ambulance Station - Refurbishment works in the Emergency Call Centre (AOC) at Hellesdon Ambulance Station

Status: Open
Published Date: 27/01/2024
Closing Date: 06/02/2024
Value: £130,000
Internal & External Alterations at Melbourn Ambulance Station - Internal & External Alterations at Melbourn Ambulance Station

Status: Awarded
Published Date: 09/01/2024
Closing Date: 31/12/2023
Value: £18,439
Bunyan Centre Mechanical Works - Bunyan Centre Mechanical Works

Status: Awarded
Published Date: 09/01/2024
Closing Date: 31/12/2023
Value: £24,905
Kempston Pool - Various Essential Work - Kempston Pool - Various Essential Works

Status: Open
Published Date: 08/12/2023
Closing Date: 29/12/2023
Value: £80,000
Internal & External Alterations at Melbourn Ambulance Station - Internal & External Alterations at Melbourn Ambulance Station

Status: Open
Published Date: 30/11/2023
Closing Date: Unknown
Value: £14,500,000
BBC East Bank Fit Out Works - For almost a century, Maida Vale Studios has served as an important asset in supporting the BBC’s commitment to make the widest range of music available to widest possible audience. However, it is clear that the facility is no longer fit for purpose in supporting the BBC’s future aspirations. As such the BBC prepares to welcome a new purpose-built home on the former Olympic site in Stratford, East London. The new site, delivered in association with the London Legacy Development Corporation (LLDC), bring partnerships with the V&A, Sadler’s Wells and UAL is designed to house and facilitate the BBC’s live music output from the BBC Symphony Orchestra and Chorus, the BBC Singers, and the BBC’s Rock and Pop output. The project is split into two phases: - The Shell and Core of the BBC building and masterplan for the site is being delivered by the developer LLDC, the Construction Manager Mace, and the Architects Allies and Morrison. - The BBC is responsible for the design and delivery of the Fit-Out of the space. The project comprises 2 studios with control rooms, visualisation rooms, workshops and an edit suite complete with ancillary spaces. Please see the Tender documentation for more details. The works will be tendered on a single stage traditional tender basis. The response to the ITT will therefore be on the basis of RIBA Stage 4 design information which has been completed by the design team, this will need to be fully priced by the Tenderer. The anticipated contract value is in the range of £13,000,000 and £14,500,000 . Please be aware that the site is within the Olympic Park site that includes West Ham Stadium and the Aquatic Centre amongst other sites. The Contractor needs to accommodate for this in their Tender.