221 Results (0.1 seconds)

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Closed
Published Date: 14/05/2024
Closing Date: Unknown
Value: neg.
Gas Heating & Associated Works - Gas Heating & Associated Works for 54 North Homes

Status: Open
Published Date: 03/05/2024
Closing Date: 15/05/2024
Value: £150,000
Replacement of the Main Gas Heating Boiler Plant at Alexander Hosea Primary School, South Gloucestershire - The project requirement is to replace the existing gas fired heating boiler plant with new during the school summer holiday period 24th July - 30th August 2024 at Alexander Hosea Primary School, Wickwar, South Gloucestershire GL12 8PF. A full and detailed specification and drawings (RIBA/ ACE stage 4) will be issued for the works at the tender stage including all elements of M&E work and builders work. The Council is seeking a Gas Safe® Heating Contractor to act as the Principal Contractor with the capability and experience to manage specialist sub-contractors to undertake and execute the contract works. The Council will not consent to the whole of the works to be sub-contracted. The Contractor will need to demonstrate they have recently completed at least two similar projects successfully (similar scope of work, value and timescale) and they have the competency and sufficient resources to meet these requirements. The Contractor shall appoint a full-time site-based site supervisor throughout the works on site. It is expected the Contractor will have to work longer weekdays and weekends during the works period to complete the work within the contract programme requirements and include these costs in their tender. The works shall be carried out in accordance with the Construction (Design and Management) Regulations 2015. The Contractors will need to demonstrate they are fully conversant with their responsibilities under the Regulations in their tender return and allow for all costs associated with their management of the Contract. The whole of the works are to be carried out in accordance with the terms and conditions of the JCT Minor Works Building Contract without Quantities 2016, published on behalf of The Joint Contracts Tribunal Limited by Thomson Reuters (Legal) Limited trading as Sweet & Maxwell. The Contractor shall obtain a copy of The Joint Contracts Tribunal Limited Standard Building Contract without Quantities 2016 and shall make themselves aware of the conditions therein. The Council is undertaking a restricted tender process to shortlist the number of contractors pricing the project to no more than five. Contractors submitting this 'first stage' SSQ will need to meet the minimum (pass/fail) qualification requirements, provide examples of successfully completing projects of similar nature, value, timescale and complexity in Section 6. Complete question (to be scored) in Section 12.

Status: Awarded
Published Date: 03/05/2024
Closing Date: 05/04/2024
Value: neg.
TEC Partnership - Replacement & Decentralisation of Heating Systems - AWARD - This specification describes the proposed replacement and decentralisation of the LPHW heating system serving the single-storey construction wing of Block B at the Grimsby Institute Campus. This scope of works shall also include the installation of new heating controls and associated electrical works (power supplies, control wiring and containment). The site installation works will be programmed over a period of 4 months, making use of the holiday periods for carrying out the most disruptive works. All tender returns must offer all 3 options to be considered: 1) Full scope of project as per attached specification document 2) Split project: Boiler house installation and associated pipework (Summer 2024), installation and connection of new radiators and radiant panels and hot water provisions as per specification (Summer 2025) 3) Works to boiler house and associated pipework and connect to old devices only. (Summer2024)

Status: Open
Published Date: 02/05/2024
Closing Date: Unknown
Value: neg.
2024-2025-010 Heating 11-40 High Cross - Heating and Hot Water Equipment Replacement

Status: Open
Published Date: 02/05/2024
Closing Date: 07/06/2024
Value: neg.
2024-2025-010 Heating 11-40 High Cross - Heating and Hot Water Equipment Replacement

Status: Open
Published Date: 05/04/2024
Closing Date: Unknown
Value: £75,000,000
EPHEAT24 - Heating Installation, Servicing and Maintenance Framework - This Framework procurement is for those Service Providers who can deliver the works and services under this Framework which will consist of but is not limited to: Heating Installation, Servicing and Maintenance. Please note, the estimated total maximum value stated in this document refers to the entire duration of the framework agreement (including call-off contracts issued during the term of the framework agreement which may extend beyond the 4-year term of the framework agreement).

Status: Open
Published Date: 14/03/2024
Closing Date: 12/04/2024
Value: neg.
The Woodlands School (Hazeley)- Replacement of Boilers - Milton Keynes City Council are currently out to tender for the provision of The Woodlands School (Hazeley)- Replacement of Boilers Suppliers that would like to take part in this tender process are invited to 'Express Interest' upon which the will be given access to the full tender documentation delivery through this e-tendering system. When the tender documents have been made available involved suppliers will receive notification via email and the tender documents can be accessed from the 'My Tenders' area of this website and selecting the 'View Details' button of this project. The deadline for submissions of the tender will be 12 Noon 12 April 2024 Please allow sufficient time to make your return as late returns will not be permitted. Any questions relating to this tender should be made via correspondence on the website .

Status: Awarded
Published Date: 11/03/2024
Closing Date: 19/01/2024
Value: £64,000,000
Thirteen Repairs and Maintenance Framework - AWARD - Thirteen are looking to procure a Framework contract to provide support to the Investment and Maintenance In-House Teams on an "as and when" basis during periods of peak workload. The scope of this Framework Agreement is for the provision of responsive repairs (including commercial properties), maintenance works, void repairs (including MSD voids), electrical works and damp and mound in line with the provided specifications. The specific work types have been split into separate packages (Lots) These services shall fall into 5 'Lots' reflecting the area of support needed for the business. The Framework contract will be for 2 years with the option to extend for further 2 years (4-year maximum). This Framework may be utilised by other Service Areas within Thirteen Housing Group providing Thirteen and the Contractor agree in writing to use of this Framework and its Terms and Conditions prior to any works commencing. Thirteen are seeking to appoint up to 5 contractors per lot, on an "as required basis" to support and supplement the in-house team in their day to day works and out of hours emergencies

Status: Open
Published Date: 07/03/2024
Closing Date: Unknown
Value: neg.
Framework Agreement for the Provision of Domestic Heating and Hot Water System Installations - Framework Agreement to support the Council’s in-house capacity for the installation of heating and hot water systems (‘HHWS’) and all associated components within the Council’s residential housing stock.