12 Results (0.1 seconds)

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Open
Published Date: 20/06/2023
Closing Date: 08/08/2023
Value: £500,000
GB-Bristol: Replacement Sewage Treatment Works & Compound - NOTE: This notice was updated on 01 August 2023 for the following reason: Closing Date extended until 29th August 2023 - 12noon(You are invited to tender for the replacement of existing 'above ground' sewage treatment works, with new 'underground' packaged sewage treatment plant. Inclusive of new compound construction, utility supplies and renewable technology as detailed in the Scope. )

Status: Open
Published Date: 25/04/2023
Closing Date: 25/05/2023
Value: £95,000,000
Sewage Treatment & Pumps Framework - National Framework Partnership seeks to establish a Sewage Treatment & Pumps Framework for use by Hyde Housing Association and any UK public sector body. To include any future successors to these organisations. (A full list of potential contracting authorities who may use the framework can be found here under the most recent file: https://www.ons.gov.uk/economy/nationalaccounts/uksectoraccounts/datasets/publicsectorclassificationguide). The framework scope will include but not be limited to servicing, maintenance and responsive repairs of Booster, Sewage and Surface Water Pumps.

Status: Awarded
Published Date: 11/08/2022
Closing Date: 19/04/2022
Value: £25,100
Replacement of Septic System with Sewage Treatment Plant - Replacement of a non-operational septic system with a sewage treatment plant, with associated drainage, to Housing Association properties in TN15.

Status: Closed
Published Date: 26/05/2022
Closing Date: 24/06/2022
Value: £50,000
GB-Gosport: OPA T505 - Plumley PSD Sewage Treatment Plant, Supply, Fit and Commission - The Plumley depot was built in the 1950's and therefore has aging infrastructure. Currently the sewage system from the Plumley site office utilises a septic tank system. This discharges via pipes/ ditches and the site interceptor, eventually to the Peover Eye river off site. In order for the site to remain legally compliant in terms of discharges, there is a requirement to upgrade the sewage system at Plumley to a treatment plant that complies with modern standards. There is no requirement for any work at the CoGH site. There is an urgent requirement to fit this new system as soon as possible. Please refer to RFQ documents.

Status: Closed
Published Date: 11/08/2021
Closing Date: 08/09/2021
Value: neg.
Stonehenge Sewage Microreactor (MBR) System Optimisation - Enhancements to existing MBR system at Stonehenge Visitor Centre to create efficiency in processing capacity.

Status: Awarded
Published Date: 21/05/2020
Closing Date: 01/11/2019
Value: neg.
Broughton Sewage Treatment Plant Upgrade - NWAS has a requirement for a Supplier(s) to upgrade the existing sewage treatment plant are their Broughton site

Status: Closed
Published Date: 07/01/2020
Closing Date: 28/01/2020
Value: £50,000
GB-Shepton Mallet: MW1946 STP - NOTE: This notice was updated on 24 January 2020 for the following reason: Expression of Interest extended to 06th February 2020(The project consists of decommissioning and removing an existing sewage treatment plant and installing and commissioning a new sewage treatment plant and associated pipework and replacing most of the existing outfall pipework. The site is currently occupied and will need alternative means for dealing with the foul water arisings during the works.)

Status: Closed
Published Date: 04/10/2019
Closing Date: 01/11/2019
Value: neg.
Provision of improvement works to drainage and wastewater treatment works - Improvement works are required to drainage and wastewater treatment works involving insitu repairs and replacement to existing damaged underground drainage pipework. Location: North West Ambulance Service NHS Trust Broughton Headquarters, 451 Garstang Road, Preston, PR3 5LN

Status: Closed
Published Date: 05/04/2019
Closing Date: 03/05/2019
Value: £200,000
SDC Burtle Sewage Treatment Works Replacement - Sedgemoor District Council wishes to appoint a suitably qualified contractor to undertake construction works to replace an existing sewage treatment plant at Burtle. A full detailed specification is enclosed together with drawings and other relevant information to enable contractors to provide a suitable tender response. Further details may be obtained from www.supplyingthesouthwest.org.uk