60 Results (0 seconds)

Status: Withdrawn
Published Date: 25/04/2024
Closing Date: 01/05/2024
Value: £20,000
SMP Alliance - Pavement Testing - On behalf of SMP Alliance (comprising Balfour Beatty Civil Engineering Ltd, bmJV (a joint venture between BAM Nuttall Ltd and Morgan Sindall Construction & Infrastructure Ltd), Costain Ltd, Fluor Ltd, Jacobs UK Ltd and WSP UK Ltd) working with National Highways we are inviting expressions of interest for the PAVEMENT TESTING. This notice covers National Highways CBR Testing for the M1 North on the National Emergency Area Retrofit (NEAR) Schemes. In some circumstances it is our primary intention to utilise in-house expertise or existing arrangements, and as such we may only use this exercise for contingency where capacity and/or schedule and resource dictates that we seek external support. This notice will remain live for one week, however, SMP Alliance reserves the right to extend or reopen this notice thereafter, or to otherwise provide future opportunity for further registration with regards this scope of works. SMP Alliance will not be bound to issue any invitation to tender to any party at any time and reserves the right to seek quotations from all / some / none of the prequalified suppliers at its sole discretion.

Status: Open
Published Date: 25/04/2024
Closing Date: 01/05/2024
Value: £20,000
SMP Alliance - Pavement Testing - On behalf of SMP Alliance (comprising Balfour Beatty Civil Engineering Ltd, bmJV (a joint venture between BAM Nuttall Ltd and Morgan Sindall Construction & Infrastructure Ltd), Costain Ltd, Fluor Ltd, Jacobs UK Ltd and WSP UK Ltd) working with National Highways we are inviting expressions of interest for the PAVEMENT TESTING. This notice covers National Highways CBR Testing for the M1 North on the National Emergency Area Retrofit (NEAR) Schemes. In some circumstances it is our primary intention to utilise in-house expertise or existing arrangements, and as such we may only use this exercise for contingency where capacity and/or schedule and resource dictates that we seek external support. This notice will remain live for one week, however, SMP Alliance reserves the right to extend or reopen this notice thereafter, or to otherwise provide future opportunity for further registration with regards this scope of works. SMP Alliance will not be bound to issue any invitation to tender to any party at any time and reserves the right to seek quotations from all / some / none of the prequalified suppliers at its sole discretion.

Status: Awarded
Published Date: 14/03/2024
Closing Date: 22/12/2023
Value: £449,528
Provision of topographical and utilities surveys at various locations across in Hull relating to Hull District Heating Network Project, Mini-competition - Hull City Council has appointed Ridge and Partners LLP to undertake the topographical and utilities surveys at various locations across in Hull relating to the Hull District Heating Network project. A mini-competition was carried out through the Engineering and Regeneration Professional Services Framework (herein referred to as the ERPS Framework), Lot 7.

Status: Awarded
Published Date: 09/02/2024
Closing Date: 06/12/2022
Value: £2,500,000
HS2 Main Works S1 & S2 - WP023 - Crane Maintenance - Skanska Costain Strabag Joint Venture (SCSJV) are seeking supply chain partners to provide crane maintenance services for the HS2 Main Works Civils Contract Area Central. The Subcontractor provides all management, people, equipment, plant and materials, consumables (including fuels) and any other resources necessary to carry out and complete the items below. Timing of work to be agreed 4 weeks prior to planned commencement. LOLER thorough examination of each crane (e.g., https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm). Periodic LOLER thorough examination according to LOLER requirements Including but not limited to: ­Wear checks and measurements on brakes, ropes, mechanical and electrical components ­Visual inspections and functional checks of all components, including but not limited to brakes and safety devices ­All brakes are visually inspected thus ensuring that the brakes are working efficiently and without undue wear. ­Visual checks for defects - all components. ­Visual structural inspection of the crane. ­Non-destructive testing, load testing and other tests as deemed appropriate by the competent person. ­Disassembly or internal examination of parts as required to conduct the above examination items. ­Any other checks as specified by the manufacturer. Report of inspection as per LOLER requirements (e.g. LOLER Schedule 1: https://www.legislation.gov.uk/uksi/1998/2307/schedule/1/made). Immediate notification to Contractor of any defects noted to be a danger to people. Schedule of examinations to be every 6 months initially (following examination at commissioning) then adjusted as needed according to as per a competent person recommendation taking into account the work environment and historical findings. Adhoc inspections maybe required in the event of exceptional circumstances (e.g. damage). Bimonthly servicing (every two months). This may be adjusted should the servicing reports indicates more, or less frequent inspections are required. Upon completion a detailed report to be provided to the Contractor. Quote for remedial works associated with any defects identified to be provided. Servicing to consist, as a minimum, of the following: ­Wear and other defect checks of load ropes ­All safety devices are checked for correct operation and adjusted as required ­All electrical components are checked for wear, cleaned, and adjusted where necessary. ­All brakes are adjusted to the correct settings, thus ensuring that the brakes are working efficiently and without undue wear. ­All safety devices are checked for correct operation and adjusted if required. ­All mechanical components are checked for wear. ­Full lubrication program as per OEM and/ or industry recommendations Subcontractor to provide a breakdown response service which includes out of hours unscheduled onsite work and over the phone assistance. This service to be provided 24x7 unless otherwise agreed.

Status: Awarded
Published Date: 02/01/2024
Closing Date: 04/12/2023
Value: £67,146
GB-Swindon: UKRI-3339 Dish Characterisation Survey - Surface Survey of the Dish at Chilbolton Observatory

Status: Awarded
Published Date: 15/08/2023
Closing Date: 30/06/2023
Value: £100,000
Highways SCANNER Survey 2023 - An experienced and UKPMS accredited SCANNER survey on our Principle (A Class), Non-Principle (B & C Class) and important Unclassified Roads throughout the county in accordance with the "SCANNER surveys for Local Roads User Guide and Specification Volumes 4 & 5" (including the commissioning of a suitable Independent Auditor by the Contractor),

Status: Awarded
Published Date: 10/08/2023
Closing Date: 01/04/2023
Value: £143,000
PLACE 165 SCRIM Surveying Services - SCRIM surveys

Status: Awarded
Published Date: 12/04/2023
Closing Date: 24/03/2022
Value: £30,000
Highways Conditions Surveys and Associated Services 2022-23 - To supply and provide software services and data in relation to Highways Condition Surveys and Skid Resistance

Status: Awarded
Published Date: 12/04/2023
Closing Date: 02/02/2023
Value: £33,000
Highways Conditions Surveys and Associated Services - To supply and provide software services and data in relation to Highways Condition Surveys and Skid Resistance

Status: Closed
Published Date: 28/02/2023
Closing Date: 24/03/2023
Value: neg.
2392/T/CW/ES To produce a 6 Facet Survey. - 2392/T/CW/ES For Specialist Building Surveyors to produce a 6 Facet Survey for premises owned by Rotherham, Doncaster and South Humber NHS Foundation Trust. Documents available on this link https://health-family.force.com/s/Welcome