36 Results (0 seconds)

Status: Open
Published Date: 05/04/2024
Closing Date: 03/05/2024
Value: neg.
Steps Connecting MKWRP and Colts Holm Road - To erect a steel staircase to facilitate the integration of Colts Holm Road as part of the Wolverton Resource Campus. A proposed pedestrian steel staircase with new lockable gates, with handrail set into concrete foundation encompassed where necessary by a 2-metre-high proposed green weldmesh fence and LED street lighting.

Status: Awarded
Published Date: 12/02/2024
Closing Date: 01/02/2024
Value: £27,063
GB-Swindon: UKRI-3767 UHV Translations Stages for chambers - UKRI-3767 UHV Translations Stages for chambers

Status: Awarded
Published Date: 12/02/2024
Closing Date: 09/02/2024
Value: £42,964
GB-Swindon: UKRI-3786 Supply of Raw Stainless Steel Bar - UKRI-3786 Supply of Raw Stainless Steel Bar

Status: Awarded
Published Date: 16/01/2024
Closing Date: 19/11/2023
Value: £72,000
Storage of 185 tonnes of stainless steel - Storage of 185 tonnes of stainless steel

Status: Awarded
Published Date: 21/12/2023
Closing Date: 04/12/2023
Value: £26,759
Stainless Steel Plates - ***Please note this is an award notice, not a call for competition*** UK Research and Innovation (UKRI) had a requirement for Stainless Steel Plates. This procurement has been concluded as a competitive quotation (below threshold)

Status: Awarded
Published Date: 06/12/2023
Closing Date: 27/11/2023
Value: £65,000
Grey Street - Steel Edging, Fabrication and Supply - As part of the ongoing City Centre Transformation programme, the next phase at Grey Street commenced in January 2023. An integral part of the designs and improvements includes new seating which will be located within 4 new Rain Gardens on the East side of Grey Street. This procurement seeks to find a suitable contractor to design , fabricate and supply the Steel edging required for the new rain gardens areas. The Deadline date and time for this opportunity is Monday 27th November 2023 at 2pm. Late submissions will not be accepted. Please search for this opportunity (Reference - DN697891 or C-012577) via the following website: www.nepoportal.org

Status: Open
Published Date: 13/11/2023
Closing Date: 27/11/2023
Value: £65,000
Grey Street - Steel Edging, Fabrication and Supply - As part of the ongoing City Centre Transformation programme, the next phase at Grey Street commenced in January 2023. An integral part of the designs and improvements includes new seating which will be located within 4 new Rain Gardens on the East side of Grey Street. This procurement seeks to find a suitable contractor to design , fabricate and supply the Steel edging required for the new rain gardens areas. The Deadline date and time for this opportunity is Monday 27th November 2023 at 2pm. Late submissions will not be accepted. Please search for this opportunity (Reference - DN697891 or C-012577) via the following website: www.nepoportal.org

Status: Closed
Published Date: 07/09/2023
Closing Date: Unknown
Value: neg.
Supply, Fabrication and Installation of Various Steelwork Packages - Supply, fabricate and install various steelwork packages for the Centre of Excellence in St Helen, North West England.

Status: Closed
Published Date: 13/07/2022
Closing Date: 12/08/2022
Value: £260,000
Autoclave trays - Stainless steel and plastic trays required

Status: Closed
Published Date: 14/01/2022
Closing Date: 28/01/2022
Value: neg.
HS2 C1 ALIGN JV - Structural Steel at Shaft Head Houses and Portal Buildings (Supply & Install) - The Contractor (Align JV) has identified a package of works for the supply and installation of Primary Steel associated with our works on the Chiltern Tunnels Shaft Head Houses and Portal Buildings. The scope of works will include the undertaking of shop drawings, manufacture, supply, delivery and required plant and cranage to install approx. 260T of primary steelwork. This includes all steel columns, beams and bracing elements supporting the roof and all connections to the headhouse and portal buildings RC elements. The subcontractor will be responsible for the connection design and the design of fixings between steelwork and RC elements. The package will be competitively tendered and assessed against a split between commercial (price) and defined technical criteria. In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.