29 Results (0 seconds)

Status: Open
Published Date: 05/04/2024
Closing Date: 03/05/2024
Value: neg.
Steps Connecting MKWRP and Colts Holm Road - To erect a steel staircase to facilitate the integration of Colts Holm Road as part of the Wolverton Resource Campus. A proposed pedestrian steel staircase with new lockable gates, with handrail set into concrete foundation encompassed where necessary by a 2-metre-high proposed green weldmesh fence and LED street lighting.

Status: Open
Published Date: 09/06/2023
Closing Date: 12/07/2023
Value: £500,000
GB-Letworth Garden City: Non-Slip Stair Coating Works, Letchworth - settle is seeking to appoint a suitably qualified and experienced concrete stair covering and contractor to carry out stripping back and re-covering works to stairwells to a number of blocks throughout the Jackmans Estate in Letchworth.

Status: Closed
Published Date: 10/01/2023
Closing Date: 20/01/2023
Value: £50,000
GB-Bircham Newton: Staircases for NCC - CITB require two permanent staircases designed, fabricated and installed inclusive of all required surveys and groundworks at our National Construction College (NCC)

Status: Awarded
Published Date: 12/10/2022
Closing Date: 06/10/2022
Value: £67,290
Roof Access Stair Replacement at Holme Valley Hospital - Roof Access Stair Replacement at Holme Valley Hospital

Status: Awarded
Published Date: 29/09/2022
Closing Date: 20/09/2022
Value: £29,126
Install Staircase - Installation of Galvanised Staircase and Handrails

Status: Awarded
Published Date: 11/04/2022
Closing Date: 25/01/2022
Value: £38,964
GB-Cromer: LIB03- Cromer Library - Staff Area Refurbishment and New Meeting Room - The works are to convert the existing staff WC into an accessible facility. Creation of new office area and access to kitchen. A new meeting room will be built on the ground floor of the main library under the mezzanine level. The mezzanine stairs will be replaced for a compliant staircase and relocated.

Status: Closed
Published Date: 03/12/2021
Closing Date: 07/01/2022
Value: £50,000
GB-Cromer: LIB03- Cromer Library - Staff Area Refurbishment and New Meeting Room - The works are to convert the existing staff WC into an accessible facility. Creation of new office area and access to kitchen. A new meeting room will be built on the ground floor of the main library under the mezzanine level. The mezzanine stairs will be replaced for a compliant staircase and relocated.

Status: Closed
Published Date: 14/07/2021
Closing Date: 30/07/2021
Value: £150,000
SASWP14 - GRS Staircase, Parapets, Cess Walkways, Stairs - Subcontractor to manufacture, supply and install the below to the SAS13 Bridge Replacement: - West Abutment - 4 Flight GRP Staircase (approx 7m height) - West Abutment - GRP Parapets - Replacement SAS13 Bridge - GRP Cess Walkway and Parapets to each side of 92m bridge deck - East Abutment - GRP Stairs from NE Wingwall to Abutment - East Abutment - GRP Stairs from NE Wingwall to Cess Walkway - East Abutment - GRP Stairs from SE Wingwall to Cess Walkway - East Abutment - 5 x 5 Step GRP Stairs on NE Wingwall - East Abutment - GRP Parapets to abutment, NE Wingwall, SE Wingwall Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete. The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include: - Quality - Sustainability - Competence - Commercial Price - Etc Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team. Best and final offers may be requested from tenderers. Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3). The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.

Status: Closed
Published Date: 26/11/2020
Closing Date: 06/01/2021
Value: £500,000
GB-Barnet: Replacement staircases - works are to demolish and remove the 3 existing staircases, fit new steel staircases and make good surrounding areas. to 3 number blocks each 3 storeys high in EN5 area

Status: Closed
Published Date: 15/07/2020
Closing Date: 10/08/2020
Value: £50,000
GB-Rickmansworth: Watersmeet New External Staircases - Supply and install two new staircases and all associated works, Watersmeet, Rickmansworth, Herts.