13 Results (0.1 seconds)

Status: Open
Published Date: 01/03/2024
Closing Date: 03/04/2024
Value: £141,000
HVAC Maintenance and Repair Contract - Gentoo has a number of offices, depots and blocks within the boundaries of Sunderland, Houghton, Hetton and Washington - Tyne and Wear. Many of these premises have heating ventilation and cooling (HVAC) systems installed within them. he Group is currently seeking to procure a Contractor to deliver preventative maintenance services to all of those systems. This will be undertaken by carrying out regular inspections of all equipment in a planned manner, identifying current or potential future issues and then carrying out any necessary repairs to ensure the systems continue to operate effectively. In addition to the above, the Provider will also be required to attend and rectify the systems as and when they fail to operate effectively or break down completely. This work is responsive, and will be required to be completed within pre-set timeframes. Effectively, this tender is to procure Providers to control all maintenance and repair works required to these systems. It is the intention of Gentoo to appoint one Provider to deliver these works.

Status: Open
Published Date: 26/02/2024
Closing Date: 01/01/0001
Value: £141,000
HVAC Maintenance and Repair Contract - Gentoo has a number of offices, depots and blocks within the boundaries of Sunderland, Houghton, Hetton and Washington - Tyne and Wear. Many of these premises have heating ventilation and cooling (HVAC) systems installed within them. he Group is currently seeking to procure a Contractor to deliver preventative maintenance services to all of those systems. This will be undertaken by carrying out regular inspections of all equipment in a planned manner, identifying current or potential future issues and then carrying out any necessary repairs to ensure the systems continue to operate effectively. In addition to the above, the Provider will also be required to attend and rectify the systems as and when they fail to operate effectively or break down completely. This work is responsive, and will be required to be completed within pre-set timeframes. Effectively, this tender is to procure Providers to control all maintenance and repair works required to these systems. It is the intention of Gentoo to appoint one Provider to deliver these works.

Status: Awarded
Published Date: 21/02/2024
Closing Date: 26/09/2023
Value: £130,000
Supply and Install of Central Water Recirculation System - Supply and Install of Central Water Recirculation System

Status: Open
Published Date: 14/02/2024
Closing Date: 28/02/2024
Value: £50,000
Plate Heat Exchangers - ST23 - P143a - You are invited to submit a tender for the Authority's requirement for Plate Heat Exchangers. The Authority has a requirement for the procurement of plant associated with a domestic hot water upgrade scheme at Lewisham Hospital. To suit programme constraints the procurement of new steam to domestic hot water plate heat exchanger packages and buffer vessels will be a direct order through the hospital whilst the process for appointing a Main Contractor for the scheme is undertaken. Thus allowing the plant to be put into manufacture prior to Main Contractor appointment. It is intended that once a Main Contractor is appointed, plant supplier will be novated to the Main Contractor who will be responsible for the management /co-ordination of plant supply, delivery and installation and attending any site related issues.

Status: Closed
Published Date: 29/11/2021
Closing Date: 20/12/2021
Value: £50,000
Heating and Ventilation - Birmingham Ceremonies Ltd is seeking an experienced, reputable, and highly skilled company to provide heating and ventilation systems to support the Opening and Closing Ceremonies of the Birmingham 2022 Commonwealth Games. Tenderers must have a proven track record of supplying and installing heating and ventilation systems, preferably in the West Midlands region.

Status: Closed
Published Date: 09/07/2021
Closing Date: 13/08/2021
Value: £200,000
H3AT Isotope Separation System - The Isotope Separation System (ISS) is a sub-system of the H3AT Facility ITER-like Tritium Loop, designed to separate hydrogen isotope gas mixtures by cryogenic distillation. It will take mixed hydrogen isotopes from the Hydrogen Purification System and protium from the Water Detritiation system, to produce isotope streams to suit ITER, DEMO and H3AT research requirements. This sub-system will feed tritium and deuterium to the Storage and Distribution System and protium to the Water Detritation System. This system will comprise 4 cryogenic distillation columns, cold box, valve box, packed bed reactors (equilibriators), expansion vessels and refrigeration plant.

Status: Awarded
Published Date: 26/03/2021
Closing Date: 29/01/2021
Value: neg.
Calorimeter, Hypervapotrons, Beam Line Module Frame and Residual Ion Dump for MAST-U Enhancements Project - The United Kingdom Atomic Energy Authority carries out research into the use of controlled nuclear fusion for the generation of power. The Mega Amp Spherical Tokamak Upgrade (MAST-U) is one such fusion experiment which is due to undergo enhancements. The Authority now has a requirement for the Completion of the Detailed Design, Manufacture, Assembly, Testing and Supply of the following enhancements: - Residual Ion Dumps (upper and lower); - Calorimeter and associated Hypervapotrons; - Beamline Module Frame (BLMF) - a frame which supports the Residual Ion Dumps, Bend Magnets, Calorimeter, and associated services.

Status: Closed
Published Date: 19/11/2020
Closing Date: 29/01/2021
Value: neg.
Calorimeter, Hypervapotrons, Beam Line Module Frame and Residual Ion Dump for MAST-U Enhancements Project - The United Kingdom Atomic Energy Authority carries out research into the use of controlled nuclear fusion for the generation of power. The Mega Amp Spherical Tokamak Upgrade (MAST-U) is one such fusion experiment which is due to undergo enhancements. The Authority now has a requirement for the Completion of the Detailed Design, Manufacture, Assembly, Testing and Supply of the following enhancements: - Residual Ion Dumps (upper and lower); - Calorimeter and associated Hypervapotrons; - Beamline Module Frame (BLMF) - a frame which supports the Residual Ion Dumps, Bend Magnets, Calorimeter, and associated services. Full details of the requirements scope are contained in the Technical Specification which is available with the Invitation to Tender by following the link below. To download the documents you must be logged into the eu-supply portal and have expressed an interest (Registration is free).

Status: Closed
Published Date: 12/11/2020
Closing Date: 27/11/2020
Value: £40,000
Supply and Installation of Skid Mounted Chiller - There is a requirement for a skid mounted air-cooled chiller and control equipment inclusive of the design, manufacture, inspection, works testing, delivery to site, installation and setting to work. This packaged unit will replace two existing chillers which were installed in 2012. The existing chillers have a cooling capacity of c. 35kW (each unit). The removal and disposal of existing equipment will form part of this requirement. This RFQ is seeking a single source arrangement with the successful tenderer whom will be required to provide all necessary equipment, labour, materials and plant for the supply, the scope of which is further detailed in the procurement documentation.

Status: Closed
Published Date: 14/11/2017
Closing Date: 29/11/2017
Value: £164,176
Heat Exchangers and Air Cooled Chillers - Background information on The University of Manchester The University of Manchester is Britain's largest single-site university, with a proud history of achievement and an ambitious agenda for the future. The University provides world-class research facilities and undertakes research of international standing. It offers students a wide choice of degree programmes and options, and excellent facilities and student support services. The University employs over 12,000 staff and offers over 400 different degree courses. It comprises of three faculties with 23 academic schools and hundreds of specialist research groups. The University's cultural attractions include The Manchester Museum, The Whitworth Art Gallery, Jodrell Bank Observatory and the Martin Harris Centre for Music and Drama. The University also operates a thriving conference and meeting operation including a hotel and conference centre. Further details on the University can be found at: http://www.manchester.ac.uk/discover/facts-figures/Background information on Project The equipment is being purchased for the Graphene Engineering and Innovation Centre (GEIC) at the University of Manchester. The GEIC is a £60 million investment which will establish a state of the art research and technology development facility for graphene and related 2D materials. Projects in the GEIC will be industry-led and will focus on innovation and applications, with the aim of accelerating research through to products in the marketplace. The GEIC will house pilot production facilities and characterisation equipment. It will initially focus on a number of the University's world-class graphene application areas: energy, composites, formulations and coatings, electronics and membranes. Given the world leading graphene research at the University, it is expected that all the equipment in the GEIC will be cited in high profile academic publications as well as underpinning industrial collaboration projects, thus giving the equipment a high degree of exposure. The GEIC will be situated on the North Campus of The University of Manchester, comprise of 8400 m2 and has been designed by world-renowned architect Rafael Viñoly. It is set to be open in summer 2018. Equipment purchased before the GEIC building is opened will be temporally commissioned elsewhere in the University campus, typically in the National Graphene Institute, and then moved into the GEIC once it is completed. For further information on the GEIC please see: http://www.graphene.manchester.ac.uk/collaborate/geic/ The GEIC equipment fund is part financed by the European Regional Development Fund (ERDF) funds having been awarded under the 2014-2020 Priority Axis 1: Promoting Research and Innovation. Specification We seek to buy a selection of Heat Exchangers and Air Cooled Chillers to support a range of equipment located in the Graphene Engineering and Innovation Centre. We anticipate to purchase ...