140 Results (0 seconds)

Status: Awarded
Published Date: 20/09/2021
Closing Date: 09/09/2021
Value: £77,257
Footway Slurry Seal Programme 2021 - 2022 - This contract is for the provision of premium surface dressing for BCP Council, the Footway Slurry Seal Programme 2021 - 2022

Status: Awarded
Published Date: 15/09/2021
Closing Date: 09/06/2021
Value: £40,656
Highway Surface Repairs - Long Gate, Edlington - Surface repairs to the highway

Status: Closed
Published Date: 14/09/2021
Closing Date: 01/10/2021
Value: £20,000
Green End Access Project - The works comprise of surface construction and drainage along a section of rural public footpath for approx. 300m and a rural public bridleway for approx. 230m.

Status: Closed
Published Date: 08/09/2021
Closing Date: 24/09/2021
Value: £16,000
Goathland Dismantled Railway - track improvements - To carryout drainage and surfacing work to a public bridleway

Status: Awarded
Published Date: 11/08/2021
Closing Date: 04/08/2021
Value: £52,910
Asphalt Preservation Treatment Programme 2021-2022 - Contract for the provision of for Bournemouth, Christchurch & Poole Council 2020-21 Asphalt Preservation Treatment.

Status: Awarded
Published Date: 21/06/2021
Closing Date: 31/05/2021
Value: £170,000
TD1737 - Holborn Drive Carriageway Maintenance - TD1737 - Holborn Drive Carriageway Maintenance Direct award DCC Highways Maintenance Framework 2018-22. Lot 16 - Planned Carriageway Maintenance

Status: Awarded
Published Date: 21/06/2021
Closing Date: 31/05/2021
Value: £75,000
ENQ708 - Roe Farm Lane Carriageway Maintenance - ENQ708 - Roe Farm Lane Carriageway Maintenance Direct award DCC Highways Maintenance Framework 2018-22. Lot 16 - Planned Carriageway Maintenance

Status: Awarded
Published Date: 21/06/2021
Closing Date: 07/07/2020
Value: £32,679
Ringwood Christchurch Road Accessibility Improvements - G4_1_HCC_010 - A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020). Install two uncontrolled pedestrian crossing points either side of the Lidl roundabout on Christchurch Road including pedestrian refuges. Minor realignment to the exit kerb line from the roundabout on the southern arm, and realignment of the existing footway.

Status: Awarded
Published Date: 14/06/2021
Closing Date: 18/12/2020
Value: £73,171
Gen 4 - 1 - Green Grid Green Loop Junctions: Conde Way - G4_1_HCC_016 - A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020). Modification of existing footpath to create 3m wide shared use facilities at the Conde Way roundabout, to allow for uncontrolled dropped crossings for cyclists on all four arms. Works include • Widening of existing path, • Reshaping of traffic islands, crossings, and tactile paving • Kerbs, topsoil and grass seeding • Gully positions adjusted & connections • Associated signs and road markings. • Felling of 1 tree, crown lifting and minor vegetation clearance. • Works relating to streetlights (laid/erected by others).

Status: Awarded
Published Date: 03/06/2021
Closing Date: 26/03/2021
Value: £160,000
Provision of surface dressing treatments on the highway - Awarded - Provision of surface dressing treatments on the highway in the Oxfordshire area - Now awarded