Status: Awarded
Published Date: 15/05/2024
Closing Date: 09/04/2024
Value: £200,000
Thurcroft Junior Academy SEN Provision - The project involves removing the existing library, toilets and entrance door and forming new classrooms/kitchen in the existing library space to a new single accessible WC in the existing WC spaces, a new drying room in the existing accessible WC space and re-positioning the existing entrance doors. It is anticipated that the contract will commence in May 2024 and will run for a period of 10 weeks making the expiry date August 2024

Status: Open
Published Date: 15/05/2024
Closing Date: 07/06/2024
Value: £180,000
HAP roofing and ventilation - Roof renewal to kitchen and canteen dining flat roofs (Roofs G & I only) and mechanical ventilation works Bidders must be able to demonstrate membership of Constructionline or equivalent

Status: Open
Published Date: 04/04/2024
Closing Date: 03/05/2024
Value: £200,000
Internal decoration and floor coverings for 9 IL schemes - Progress Housing Association Ltd are looking to appoint an experienced contractor for Internal decoration and supply and fit of floor coverings for 9 Independent Living schemes as per attached specification at the following locations: Jubilee Court, Leyland, PR25 1JJ Boundary Close, New Longton, PR4 4BD Orchard Grange, Penwortham, PR1 0QH Bashall Grove, Farrington, PR25 4JU Lostock Court, Lostock Hall, PR5 5LL Tuson House, Penwortham, PR1 9PE Old Mill Court, Walmer Bridge, PR4 5QU Bridge Court, Lostock Hall, PR5 5UB Lowerfield, Croston Road, Farrington Moss, PR26 6QQ This project will be split across two lots: Lot 1 Internal Decoration. Lot 2 Supply and fit of Floor Coverings. Contractors may bid for one or both lots.

Status: Open
Published Date: 12/03/2024
Closing Date: 19/04/2024
Value: £145,000
Refurbishment of Building, Civils & Landscaping - CSNPC are looking to procure works that comprise a complete refurbishment works of the old Penhill Bowls Club building and surrounding area. Works include replacement of the roof and guttering, full internal redecoration, new doors and windows, replacement of sanitary appliance components & associated plumbing, installation of new electrical and mechanical services, replacement flooring, general repairs and installation of security shutters. External landscaping, minor civils, installation of hard standing and acoustic fencing.

Status: Open
Published Date: 01/03/2024
Closing Date: 22/03/2024
Value: £500,000
GB-Kings Lynn: Flooring Installation - Freebridge requires a supplier to install and maintain floor coverings. The main supply for materials will be via Freebridge through Travis Perkins, but Freebridge may on occasion require the supplier to provide some materials when required. The installations will be to tenanted and non-tenanted properties.

Status: Awarded
Published Date: 29/02/2024
Closing Date: 28/11/2023
Value: £7,500,000
HCC Oct 2023 - The Provision of Measured Term Contract for Building Works - Planned, Reactive and Minor Works - AWARD - Hertfordshire County Council (hereinafter referred to as the Council) has a requirement for the Provision of Measured Term Contract for Building Works - Planned, Reactive and Minor Works The works comprise of the responsive repair of building fabric services to include drainage systems, sanitaryware and cold water plumbing systems up to and including 28mm. For a period that includes 24 hours per day over 365 days per annum, incorporating an emergency repair service. Full details including the properties can be found in the tender document set. Organisations should be aware that due to the nature of the Services provided, any Contract formed as a result of this procurement process shall be executed as a deed. Organisations should seek independent legal advice on the implications of this prior to submitting their bid, where appropriate. Please Note the TUPE Employee Liability Information for this procurement has been provided along with other documentation for this procurement. TUPE related information is personal data and must be protected in accordance with the requirements of Data Protection legislation and must also be kept confidential. Therefore, by accessing this Tender via Supply Hertfordshire and then the View Details button and accessing the documentation for this procurement, Tenderers agree to undertake to treat the information as confidential and commercially sensitive at all times and take all reasonable steps to prevent any inadvertent disclosure to any third party.

Status: Awarded
Published Date: 21/02/2024
Closing Date: 26/01/2024
Value: £35,000
ERD T Block Flooring Package - ERD T Block Flooring Package Nottingham Trent University Clifton Campus NG11 8NS

Status: Open
Published Date: 12/02/2024
Closing Date: 22/03/2024
Value: £479,898
Dry Lining and Plastering - Victoria Works - This GreenSquareAccord tender project is for supply of Dry Lining and Plastering. Contract to be completed by 20th May 2026. This tender is being conducted through GreenSquareAccord`s Supplier Portal and all documentation is only available via this portal - https://in-tendhost.co.uk/greensquare Submissions must be made via this portal. All documents are required to be uploaded to the portal and you will then receive a receipt. Should you have any questions about this contract opportunity, please use the messaging facility on the tender project which will direct your question to the GreenSquareAccord colleague leading this procurement. If you experience technical difficulties accessing or using the Portal; user help is available at the help tab on the portal or alternatively, you may contact the In-Tend Support Desk on 0845 5578079 or by email at support@in-tend.co.uk.

Status: Open
Published Date: 02/02/2024
Closing Date: 04/03/2024
Value: £835,000,000
NOE CPC Specialist Estates Engineering & Maintenance Services (Hard FM) - The purpose of this procurement is to establish a framework for the provision of Specialist Estates Engineering & Maintenance Services (Hard FM). The framework will provide a one stop shop for organisations to fulfil their Specialist Estates Engineering & Maintenance Service (Hard FM) requirements, with suppliers selected for their experience and ability to provide customers with a comprehensive range of services and works that combine quality, value and compliance. The framework has been designed to facilitate current trends in FM and also to provide a flexible route for Estates and FM departments within contracting authorities to procure services. The framework Lots have been configured to enable Service Providers to be able to bid for areas within their specialism, making it friendly for SME's. Service Providers have the option of bidding for one or more Lots within the framework, with NOECPC appointing up to 12 Service Providers for each Lot. Lot 1 - Airconditioning, Air Handling Units and Refrigeration Lot 2 - Asbestos Removal Lot 3 - Automatic Doors and Roller Shutters Lot 4 - Electrical Works Lot 5 - Fire Alarm, Emergency Lighting and Fire Fighting Equipment Lot 6 - Fire Risk Assessments Lot 7 - Fire Stopping, Compartmentation and Associated Works Lot 8 - Heating and Plumbing Systems Lot 9 - Lifts, Hoists and Escalators Lot 10 - Lightning and Fall Protection Systems Lot 11 - Medical Gas Systems Lot 12 - Security Systems Lot 13 - Standby Power Systems Lot 14 - Water System Maintenance and Risk Management Lot 15 - Renewable & Low Carbon Heating Systems Lot 16 - Solar PV Lot 17 - General Building, Improvements, Installations, Repairs & Maintenance Lot 18 - High Secure (Forensic) FM Services Lot 19 - Managed FM Service This procurement exercise will be conducted on the Atamis Health Family Single e-Commercial System at: https://health-family.force.com/login

Status: Awarded
Published Date: 30/01/2024
Closing Date: 22/01/2024
Value: £126,630
Decorations and Flooring to Highfield and Truro Court via Procurement for Housing - Planned Maintenance framework - Decorations and Flooring to Highfield and Truro Court via Procurement for Housing - Planned Maintenance framework